Cepsci Practice Test Questions And Answers Latest Update

Preview 3 out of 18  pages

  • October 30, 2024
  • 18
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CEPSCI
  • CEPSCI
avatar-seller
Schoolflix
Solution 2024/2025
Pepper

Cepsci Practice Test Questions And Answers
Latest Update

1972 clean water act ANS✔✔ Administered by the US environmental
protection agency (EPA) Created the NPDES



1987 ANS✔✔ Amendment to CWA CALLED WATER QUALITY ACT



NPDES in south carolina ANS✔✔ South Carolina is NPDES delegated state.



NPDES regulations are administered by ANS✔✔ SCDHEC



CGP authorizes ANS✔✔ stormwater discharges from construction sites



Who must obtain NPDES coverage ANS✔✔ land disturbing activities greater
than or equal to 1 acre

-land disturbance less than 1 ac within 1/2 miles of water body in SC costal
zone



NPDES permits are issued to ANS✔✔ operator-person or company for a
particular discharge



primary permittee ANS✔✔ -has day to day operational control to ensure
compliance with SWPP

-typically the owner or developer

, Solution 2024/2025
Pepper



primary permittee responsibilites ANS✔✔ submit NOI, Preparation of the
C_SWPPP



Secondary permittee ANS✔✔ individual lot owner or residential builder that
conducts land disturbing activity limited to an individual lot or group of lots
as part of approved LCP of development



contractors ANS✔✔ must on Contractor Certification- D-0437



On-Site SWPPP ANS✔✔ SCDHEC CGP, NOI, NPDES coverage approval letter,
Contractor Certifications, Local Approvals, USACE approvals, Critical area
permit(coast)



OS_SWPPP ANS✔✔ a copy of signed and certified SWPPP, NOI, and CGP
coverage letter from DHEC must be retained at site or electronically
accessible



minor modification to ON-SWPPP ANS✔✔ minor modifications made directly
in the field,do not need approval by DHEC- additional BMP's, removal of
disturbed areas



major modifications to OS-SWPPP ANS✔✔ must be made by qualified
individual and submitted to DHEC or appropriate delegated entity for
approval



Phased plan requirement > 5 ANS✔✔ include a phased stormwater
management plan which identifies all BMP's and grading work conducted

, Solution 2024/2025
Pepper
during a specific portion of the sites construction sequence. Each phase
identified on at least one separate plan sheet.



Phased plan requirement < 10 but > 5 acres ANS✔✔ at least two separate
plan phases are required - initial land disturbance phase - stabilization
phase



Phased plan requirement ≥ 10 acres ANS✔✔ at least 3 separate plan phases
are required - initial land disturbance phase - construction phase -
stabilization phase



All compliance inspection must include invesg. of, at a minimum of 5 of the
following ANS✔✔ 1. areas of site disturbed by construction activity and
areas used for storage of materials exposed to precipitation

2. stormwater conveyance systems for evidence of sediment

3. BMP's identified in OS-SWPPP

4. Discharge location to investigate if sediment leaving site, or if such
locations are inaccessible, nearby downstream location if possible.

5. Where vehicles enter or exit site for evidence of off-site sediment
tracking.



inspection frequency after construction begins ANS✔✔ at least once a week
or within 24 hours of end of storm event >0.5 inches



Inspection frequency for sites that have reached temporary stablization
ANS✔✔ Once every month

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Schoolflix. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81989 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$14.99
  • (0)
  Add to cart