100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
DBIA: Principles of Design-Build and Post Award & Contracts, Project Delivery Exam Questions and Answers $11.49   Add to cart

Exam (elaborations)

DBIA: Principles of Design-Build and Post Award & Contracts, Project Delivery Exam Questions and Answers

 3 views  0 purchase
  • Course
  • DBIA
  • Institution
  • DBIA

DBIA: Principles of Design-Build and Post Award & Contracts, Project Delivery Exam Questions and Answers Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. What Year? - ANSWER-Clinger Cohen Act/Defense Procurement Reform Act...

[Show more]

Preview 3 out of 18  pages

  • October 30, 2024
  • 18
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • DBIA
  • DBIA
avatar-seller
Emillect
©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED

FIRST PUBLISH OCTOBER 2024




DBIA: Principles of Design-Build and Post

Award & Contracts, Project Delivery Exam

Questions and Answers


Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing

Design-Build. What Year? - ANSWER✔✔-Clinger Cohen Act/Defense Procurement Reform Act 1996


The level of quality that any average Design Professional would be able to perform given the

circumstances. - ANSWER✔✔-Standard of Care


Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing

incremental packages. - ANSWER✔✔-Design Build


Procurement Method - Common for A/E - ANSWER✔✔-Negotiated (Qualifications Based)


Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only

up to a certain amount. - ANSWER✔✔-GMP (Guaranteed Maximum Price)


Contract Format - cost per piece - ANSWER✔✔-Unit Price


Successful Design Build requires _____ & _______ between participants - ANSWER✔✔-Trust, Flexibility


Page 1/18

, ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED

FIRST PUBLISH OCTOBER 2024




Singular responsibility for both design & construction was first made into a building code by ____ -

ANSWER✔✔-Hammurabi


Owner provided items such as 20% design or more and provides prescriptive specs at RFP. -

ANSWER✔✔-Bridging Documents


Single point of responsibility for both design & construction is an attribute of what delivery method? -

ANSWER✔✔-Design Build


The process of checking milestones along the way for completeness. - ANSWER✔✔-Substantiation


Owner requiring specific products or methods be instituted by DB team in order to achieve desired

performance. - ANSWER✔✔-Prescriptive


T/F Detailed estimating is the Building systems approach to estimating - ANSWER✔✔-False


T/F feasibility estimate is cost model and establishes budget for project - ANSWER✔✔-False


T/F key element of quality assurance is keeping communication lines open between owner and DB -

ANSWER✔✔-True


T/F in Design/cost relationship of DB, the constructor establishes design parameters for architect -

ANSWER✔✔-True


T/F trust is most important thing for DB - ANSWER✔✔-False


Page 2/18

, ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED

FIRST PUBLISH OCTOBER 2024




DB estimating sequence where 15%-20% of design is completed - ANSWER✔✔-Schematic estimating


Provides baseline budgets and schedules and list estimate trends - ANSWER✔✔-Trend logs


What is NOT a design managers role? - ANSWER✔✔-Coordinating owner design reviews and approvals


Who is responsible for ensuring quality assurance? - ANSWER✔✔-Design Build Team


Awarded to proposer with highest combined total points of technical and price proposals - ANSWER✔✔-

Weighted criteria


Estimate provided with very little design - ANSWER✔✔-Conceptual estimating


Maintains control of budget and design process between major estimate phases - ANSWER✔✔-Trend

estimating


Owner proforma based on sq ft or ROM estimates - ANSWER✔✔-Feasibility estimate


Determines if proposer is qualified for project with yes or no statement - ANSWER✔✔-Statement of

qualifications


Contract for Design-Build Consultant Services - ANSWER✔✔-DBIA 501


Standard Form of Preliminary Agreement Between Owner and Design-Builder - ANSWER✔✔-DBIA 520


Standard Form of Agreement Between Owner & Design-Builder for a Lump Sum - ANSWER✔✔-DBIA 525


Page 3/18

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Emillect. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

83637 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart