ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AND STUDY GUIDE 150 QUESTIONS AND CORRECT ANSWERS 2024 LATEST GRADED A+ The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete $24.49   Add to cart

Exam (elaborations)

ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AND STUDY GUIDE 150 QUESTIONS AND CORRECT ANSWERS 2024 LATEST GRADED A+ The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete

 2 views  0 purchase
  • Course
  • ACI CONCRETE FIELD
  • Institution
  • ACI CONCRETE FIELD

ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AND STUDY GUIDE 150 QUESTIONS AND CORRECT ANSWERS 2024 LATEST GRADED A+ The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AN...

[Show more]

Preview 2 out of 14  pages

  • October 22, 2024
  • 14
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ACI CONCRETE FIELD
  • ACI CONCRETE FIELD
avatar-seller
2024newestexams
ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AND STUDY
GUIDE 150 QUESTIONS AND CORRECT ANSWERS 2024 LATEST
GRADED A+
The sensor of the temperature measuring device shall be submerged a minimum of _____ in.
[_____mm] into the freshly mixed concrete. - ANSWER-3 in. [75 mm]



The temperature measuring device shall have a capacity of measuring temperature of freshly mixed
concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - ANSWER-1 degree F [0.5 C],
30 degrees F to 120 F [0 C to 50 C]



The temperature measuring device shall be calibrated _____, or whenever there is a question of _____.
- ANSWER-Annually, accuracy



The temperature of concrete may be measured in a wheelbarrow. True or False? - ANSWER-True



The temperature of concrete may be measured in a wall form. True of False - ANSWER-True



A composite sample of concrete is required even if the only purpose for obtaining the sample is to
determine temperature. True of False? - ANSWER-False



What must be done to the sample container prior to sampling the concrete? - ANSWER-Dampen (with
water)



What must be done to the concrete surrounding the temperature measuring device after the device is
submerged in the fresh concrete. - ANSWER-Gently press the concrete around the temperature
measuring device at the surface of the concrete



How long must the temperature measuring device remain in the freshly mixed concrete? - ANSWER-At
least 2 minutes but not more than 5 minutes



After the temperature of the concrete is read, what is required? - ANSWER-Reporting of temperature

, The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - ANSWER-1 degree F
[0.5 C]



According to ASTM C1064, what is one reason to take the temperature of concrete? - ANSWER-Verify
conformance to a specified requirement for temperature of concrete



A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? -
ANSWER-False



The sample of concrete used for temperature determination must be rodded 25 times. True or False? -
ANSWER-False



Sampling by this method is required when tests are to be made to determine _____ with specification
requirements. - ANSWER-Compliance



This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. -
ANSWER-Stationary mixers, paving mixers, revolving drum mixers, and open top mixers



The maximum allowable time between obtaining the first and final portions of a composite sample is
_____ minutes. - ANSWER-15



Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True
of False? - ANSWER-True



The maximum elapsed time allowed between obtaining the final portion of the composite sample and
beginning the tests for slump, temperature, and air content is _____ minutes. - ANSWER-5



The molding of strength test specimens shall begin within _____ minutes after fabricating the composite
sample. - ANSWER-15



The concrete sample must be protected from contamination and _____. - ANSWER-Rapid evaporation

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller 2024newestexams. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $24.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

84146 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$24.49
  • (0)
  Add to cart