The 1970's law that set into place the regulation of stormwater is: - (correct answer) -The Clean Water
ih ih ih ih ih ih ih ih ih ih ih ih ih ih ih ih ih
Act
ih
Requirements for managing stormwater activity on a construction site are outlined in the following
ih ih ih ih ih ih ih ih ih ih ih ih ih
regulation: - (correct answer) -NPDES
ih ih ih ih ih
Which of the following is never an allowable stormwater discharge from a construction site? - (correct
ih ih ih ih ih ih ih ih ih ih ih ih ih ih ih
answer) -Discharge from contaminated groundwater
ih ih ih ih ih
The Notice of termination can filed when: - (correct answer) -All construction activity, inside and
ih ih ih ih ih ih ih ih ih ih ih ih ih ih
outside the building, is complete and permanent stabilization verified
ih ih ih ih ih ih ih ih ih
Relative to stormwater permitting, all of the following must occur before construction starts except: -
ih ih ih ih ih ih ih ih ih ih ih ih ih ih
(correct answer) -Submit the notice of termination (NOT)
ih ih ih ih ih ih ih ih
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall energy and
ih ih ih ih ih ih ih ih ih ih ih ih
slows overland flow of stormwater - (correct answer) -Vegetation
ih ih ih ih ih ih ih ih ih
Of the following factors that influence erosion rates, the one a contractor has the most control over is:
ih ih ih ih ih ih ih ih ih ih ih ih ih ih ih ih ih
- (correct answer) -Groundcover
ih ih ih ih
Temporary stabilization should be implemented - (correct answer) -Immediately on all disturbed areas
ih ih ih ih ih ih ih ih ih ih ih ih
that are likely to or will remain inactive for 14-days or more
ih ih ih ih ih ih ih ih ih ih ih ih
The Primary purpose of a construction exit is - (correct answer) -To remove sediment from
ih ih ih ih ih ih ih ih ih ih ih ih ih ih
construction site vehicles and minimize trackout
ih ih ih ih ih ih
Common types of erosion include all of the following except - (correct answer) -Sedimentation
ih ih ih ih ih ih ih ih ih ih ih ih ih
Which of the following is NOT a beneficial use of water? - (correct answer) -Flushing a spill down a
ih ih ih ih ih ih ih ih ih ih ih ih ih ih ih ih ih ih
storm drain
ih ih
When installing and maintaining a check dam make sure: - (correct answer) -The low point (overflow)
ih ih ih ih ih ih ih ih ih ih ih ih ih ih ih
of the check dam is in the middle of the channel
ih ih ih ih ih ih ih ih ih ih ih
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Wisdoms. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.99. You're not tied to anything after your purchase.