100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PJM Exam Review 2 Questions And 100% Correct Answers $9.99   Add to cart

Exam (elaborations)

PJM Exam Review 2 Questions And 100% Correct Answers

 0 view  0 purchase
  • Course
  • PJM
  • Institution
  • PJM

PJM Exam Review 2 Questions And 100% Correct Answers...

Preview 4 out of 38  pages

  • October 13, 2024
  • 38
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • PJM
  • PJM
avatar-seller
Easton
PJM Exam Review 2 Questions And 100%
Correct Answers

EOP-005-2

NERC Requirements for Critical Black Start



Each GOP with a Blackstart Resource shall notify its TOP of any Real Time changes to
the capabilities of that Blackstart Resources affecting its ability to meet the TOPs
restoration plan within _________ following such change.

24 hours

Minimum Generation Alert is implemented when the expected generation level is within
____ of normal minimum energy limits

2,500 MW



Manual Load Dump

Capacity deficient zone sheds load. If zones are deficient, load shed is proportionally
based on level of shortage.



NERC Energy Emergency Alerts (EEA)

Alerts issued by Reliability Coordinator (RC) to ensure that all RCs understand potential
and actual energy emergencies.



EEA Level 1 (All Available Resources in Use)

Control Area foresees or is experiencing conditions where all available resources are
committed



When does PJM issue an EEA Level 1?

,Maximum Generation Emergency Alert




EEA Level 2 (Load Management Procedures in Effect)

Control Area foresees or has implemented procedures up to but excluding interruption
of firm load commitments



Under What Circumstances Does PJM Declare an EEA Level 2?

Emergency Mandatory Load Management Reductions Action, a Voltage Reduction
Action, or a Deploy All Resources Action (whichever issued first)



EEA Level 3 (Firm Load Interruption Imminent or In Progress)

Control Area foresees or has implemented firm load obligation interruption




When does PJM declare an EEA Level 3?

Manual Load Dump Action



BES

Bulk Electric System



Possible Triggers for Conservative Operations:

Fuel Delivery Issues

Forrest or Brush Fires

Environmental Alerts

Bad Weather

Geomagnetic Disturbances (GMD)

Terrorist or Sabotage threats against the BES

,PJM entering as NERC defines it an "Unknown Operating State"



What are PJMs most important limits?

Interconnection Reliability Operating Limits (IROLs)



PJM Actions during Conservative Operations

Begin additional off-cost operations

Purchase additional reserves

- Can consider a number of contingencies being lost

- Additional security on communications

- Request additional system status reports

- Request members to staff backup centers, critical BES substations, black start
facilities



Member Actions for Conservative Operations:

- Provide additional reporting data

- Staff substations or generating plants

- Comply with PJM operational instructions or dispatch signals



Gas utilities prioritize ____________ during cold weather

heating over electricity generation



RTO Natural Gas Coordination Procedure:

NYISO, ISO-NE, and PJM joint effort to communicate with Gas Suppliers of Interstate
Gas pipelines to manage any potential inadequacy situations.

Data reported within the RTO Natural Gas Coordination Procedure

Interconnection points

Deals of gas supply & transmission

, Gas line maps

Interstate pipeline supplier

Location of units

Supplier list

PJM Actions during Fuel Delivery Emergencies

Weather Watch

Examine and predict gas requirement

ISO Conference calls

Acquire more data from pipelines

Strategy Development

Execute Conservation Operations

**

Member Activities for Fuel Delivery Emergency Events

Provide ancillary information

Notify PJM of gas delivery supply limitations

Comply with operating instructions

***

What fuel type is impacted when OFOs are called?

Natural Gas

***

NOAA

National Oceanic and Atmosphere Administration

***

If NOAA forecasts a geo-magnetic storm potentially at __________ or greater severity,
PJM will notify all market participants through the All-Call system and the Emergency
Procedure Posting Application

K7

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Easton. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76800 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart