PJM TEST 2024/2025 /COMPLETE ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS ) ALREADY GRADED A+.
2 views 0 purchase
Course
PJM Generation
Institution
PJM Generation
PJM TEST 2024/2025 /COMPLETE ACTUAL EXAM QUESTIONS AND CORRECT
ANSWERS (VERIFIED ANSWERS ) ALREADY GRADED A+.
PJM TEST 2024/2025 /COMPLETE ACTUAL EXAM QUESTIONS AND CORRECT
ANSWERS (VERIFIED ANSWERS ) ALREADY GRADED A+.
PJM TEST 2024/2025 /COMPLETE ACTUAL EXAM QUESTIONS AND CORRECT
AN...
PJM TEST 2024/2025 /COMPLETE ACTUAL EXAM QUESTIONS AND CORRECT
ANSWERS (VERIFIED ANSWERS ) ALREADY GRADED A+.
Which of the following balancing control modes is used by PJM under
normal operations? - ANSWER-Tie-Line Bias
Which of the following influences does PJM consider when
performing their system load forecast? - ANSWER-Weather
Conditions & Day of the Week
All of the following are limits that must be submitted to PJM for
generating units EXCEPT:
1. Eco Min
2. Eco Max
3. Emergency Max
4. Dynamic Instability - ANSWER-Dynamic Instability
If PJM experienced an event that caused the loss of a 1,000 MW
generator, which of the following would most likely provide the
quickest impact to improve the undegenerating Area Control Area
(ACE)?
Your system has experienced an event that caused the frequency to
drop below 60.00 Hz, what would be the most likely event that
occurred? - ANSWER-A generator on your system tripped offline
How does the PJM dispatcher inform the Members of the PJM
regulation Requirements? - ANSWER-All-Call
In order for your generator to quality to supply regulation in the PJM
Regulation market, it must be able to respond and attain its desired
output within how many minutes? - ANSWER-5 minutes
Based on a generator capability curve, in order to maximize the MVAR
output of the generator, it may be necessary to: - ANSWER-decrease
the MW output of the unit
PJM maintains a regulation quality standard which states that a
generator may be certified to provide regulation only after it achieves
three consecutive regulation test scores of at least - ANSWER-75%
Which of the following would NOT be a cause for a sudden deviation
in the balancing area ACE?
1. incorrect interchange number
2. loss of a tie-line RTU
,3. loss of internal load
4. loss of adjacent control area generation - ANSWER-loss of adjacent
control area generation
The primary purpose for the balancing area to have Regulation is to
correct for: - ANSWER-small deviations in load
It is necessary for Generation Owner dispatchers to notify PJM of
unplanned unit outages: - ANSWER-as soon as practicable
PJM should be made aware of any fuel shortage that a generator may
experience.
This information assists in analyzing the resources and reliably
operating the system. A heightened awareness is expected during: -
ANSWER-extreme hot or cold conditions
Generators are required to obtain PJM approval prior to removing a
generating unit from service.
The only exception is for: - ANSWER-injury to personnel will be
prevented
Prior to removing a self-scheduled generator from service, the PJM
member must first - ANSWER-give PJM the option to takeover the unit
for the market
, When PJM experiences problems with their primary digital control
signal, it sometimes becomes necessary for companies with the
capability, to switch to the back-up signal.
This backup signal is known as: - ANSWER-Analog control
When PJM sends cost signals to generators, to provide direction for
increasing or decreasing the facility output, this signal that is sent is
known as: - ANSWER-Dispatch Rate
Under normal operating conditions, what is the limit that will provide
the lowest output level of a generating unit? - ANSWER-Eco Min
When PJM send out a cost signal to generators to adjust their output,
the generating personnel adjust the output of the unit base on the
unit's - ANSWER-price or cost curve incremental
Which eSuite tool is used to maintain individual generator regulation
data that is submitted by PJM members? - ANSWER-eMarket
PJM's ACE configuration is such, that when the ACE is positive (+), it
indicates - ANSWER-too much generation
If a generator is self-scheduled, what is the minimum notification time
required in order for the MW output to be adjusted? - ANSWER-20
minutes prior to the change
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller nyagajoseph539. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $20.99. You're not tied to anything after your purchase.