100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
DBIA: Principles of Design-Build and Post Award & Contracts Questions And Answers Latest Updates $7.99   Add to cart

Exam (elaborations)

DBIA: Principles of Design-Build and Post Award & Contracts Questions And Answers Latest Updates

 2 views  0 purchase
  • Course
  • DBIA: Principles of Design-Build and Post Award &
  • Institution
  • DBIA: Principles Of Design-Build And Post Award &

The level of quality that any average Design Professional would be able to perform given the circumstances. - ️️Standard of Care Successful Design Build requires _____ & _______ between participants - ️️Trust, Flexibility Allows all federal agencies to utilize Design-Build. Prior to tha...

[Show more]

Preview 2 out of 8  pages

  • October 11, 2024
  • 8
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • DBIA: Principles of Design-Build and Post Award &
  • DBIA: Principles of Design-Build and Post Award &
avatar-seller
ACADEMICMATERIALS
DBIA: Principles of Design-Build and
Post Award & Contracts
The level of quality that any average Design Professional would be able to perform
given the circumstances. - ✔️✔️Standard of Care

Successful Design Build requires _____ & _______ between participants - ✔️✔️Trust,
Flexibility


Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation
existed allowing Design-Build. - ✔️✔️Clinger Cohen Act/Defense Procurement Reform
Act 1996


Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they
want), - ✔️✔️Design Bid Build

Federal Government passed bond requiring payment and performance bonds on all
public works, what year? - ✔️✔️Miller Act 1935

Project Delivery - Many contracts through Owner - ✔️✔️Multi Prime

Bill directing A/E's selected on qualifications, what year? - ✔️✔️Brooks Bill 1972

Project Delivery method allowing the contractor to come on board very early in design
for preconstruction services yet maintains separation between Designer and Builder
contractually. - ✔️✔️CM at Risk

Fastest Project Delivery method, fast tracking possible overlapping design with
construction utilizing incremental packages. - ✔️✔️Design Build

Procurement Method - Most Familiar - ✔️✔️Low Bid

Procurement Method - Common for A/E - ✔️✔️Negotiated (Qualifications Based)

Procurement Method - Qualifications and Price - ✔️✔️Best Value

Procurement Method - Direct - ✔️✔️Sole Source

Contract Format w/ agreed upon fixed price - ✔️✔️Lump Sum

, Contract Format - contractor reimbursed for actual cost plus an agreed upon
percentage - ✔️✔️Cost Plus Fee

Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual
cost plus a fee only up to a certain amount. - ✔️✔️GMP (Guaranteed Maximum Price)

Contract Format - cost per piece - ✔️✔️Unit Price

Contract Format - established cost/benchmark determined jointly by project team. -
✔️✔️Target Price


Singular responsibility for both design & construction was first codified by ____ -
✔️✔️Hammurabi

Owner provided items such as 20% design or more and provides prescriptive specs at
RFP. - ✔️✔️Bridging Documents

Owner is responsible for implied warranties in the sufficiency of the specifications. -
✔️✔️Spearin Doctrine

____ ____ should identify end results. - ✔️✔️Performance Requirements

Single point of responsibility for both design & construction is an attribute of what
delivery method? - ✔️✔️Design Build

The process of checking milestones along the way for completeness. -
✔️✔️Substantiation

Owner requiring specific products or methods be instituted by DB team in order to
achieve desired performance. - ✔️✔️Prescriptive

T/F Detailed estimating is the Building systems approach to estimating - ✔️✔️False

T/F feasibility estimate is cost model and establishes budget for project - ✔️✔️False

T/F key element of quality assurance is keeping communication lines open between
owner and DB - ✔️✔️True

T/F in Design/cost relationship of DB, the constructor establishes design parameters for
architect - ✔️✔️True

T/F trust is most important thing for DB - ✔️✔️False

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller ACADEMICMATERIALS. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82191 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart