100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CSLB CONCRETE C8 LICENSE 1 AND 2 EXAM NEWEST 2024 WITH COMPLETE QUESTIONS AND CORRECT VERIFIED ANSWERS (DETAILED ANSWERS) ALREADY GRADED A+ 100% GUARANTEED TO PASS CONCEPTS!!! $25.99   Add to cart

Exam (elaborations)

CSLB CONCRETE C8 LICENSE 1 AND 2 EXAM NEWEST 2024 WITH COMPLETE QUESTIONS AND CORRECT VERIFIED ANSWERS (DETAILED ANSWERS) ALREADY GRADED A+ 100% GUARANTEED TO PASS CONCEPTS!!!

 0 view  0 purchase
  • Course
  • CSLB CONCRETE C8 LICENSE 1 AND 2
  • Institution
  • CSLB CONCRETE C8 LICENSE 1 AND 2

CSLB CONCRETE C8 LICENSE 1 AND 2 EXAM NEWEST 2024 WITH COMPLETE QUESTIONS AND CORRECT VERIFIED ANSWERS (DETAILED ANSWERS) ALREADY GRADED A+ 100% GUARANTEED TO PASS CONCEPTS!!!

Preview 4 out of 33  pages

  • October 10, 2024
  • 33
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • cslb concrete c8
  • CSLB CONCRETE C8 LICENSE 1 AND 2
  • CSLB CONCRETE C8 LICENSE 1 AND 2
avatar-seller
trustednurse
CSLB CONCRETE C8 LICENSE 1 AND 2 EXAM NEWEST 2024
WITH COMPLETE QUESTIONS AND CORRECT VERIFIED
ANSWERS (DETAILED ANSWERS) ALREADY GRADED A+ 100%
GUARANTEED TO PASS CONCEPTS!!!




#1




What is the volume of a cylinder if the diameter equals 3 feet and the length
equals to 12 feet? - ANSWER-84.78 cubic feet


Explanation:
There are two ways to solve the problem. However, regardless of which
method is used, you need to first determine the area of the circle then multiply
it by the length.Traditional MethodUse the following formula:Area of the circle
= π x r x rWhere π = 3.14 and radius (r) = 1.5 feet (half of the diameter
length)Area = 3.14 x 1.5 x 1.5Area = 7.065 sq. ft.Multiply area by the length to
find the volume.7.065 x 12 = 84.78Shortcut MethodArea of the circle is 78.5%
of the square. Treat the circle as a square and solve for the area.Find the area
of the square instead of the circle.3' x 3' = 9 sq. ft.Since circle is 78.5% of the
square, multiply area of the square by 78.5% (or .785 if there is no percentage
sign on the calculator).9 sq. ft. x .785 = 7.065 square feetMultiply area by the
length to find the volume.7.065 x 12 = 84.78 cubic feet


Where are spiral rebar ties used? - ANSWER-In round columns

,Control joints in sidewalks should be spaced at what intervals? - ANSWER-Equal
to the width of the slab


Explanation:
Generally the control joints in sidewalks should be spaced equal to the width of
the slab, but not more than 6 feet apart.


One cubic foot of cement weighs approximately: - ANSWER-95 lbs


How many cubic yard of concrete is required for a 4" slab with the diameter of
15 feet? - ANSWER-2 ½ cubic yards


Explanation:
Traditional MethodUse the following formula:Area of the circle = π x r x rWhere
π = 3.14 and radius (r) = 7.5 feet (half of the diameter length)Area = 3.14 x 7.5 x
7.5Area = 176.625 sq. ft.Multiply area by the depth of the slab (in feet) to find
the volume in cubic feet.176.625 x .333 = 58.82 cubic feetConvert cubic feet
into cubic yards.58.82 ÷ 27 = 2.18 cubic yardsSince 2.18 is not a given option,
round up the number to 2.5 cubic yardsShortcut MethodThis problem can be
solved using a much simpler method. First is to find the area of the square,
then convert it into the area of the circle by multiplying it by 78.5%.Area of the
square = 15' x 15' = 225 square feetArea of the circle = 225 x .785 = 176.625
square feetDivide the volume by 81 to solve for the cubic yards for a 4"
slab.176.625 ÷ 81 = 2.18 cubic yardsSince 2.18 is not a given option, round up
the number to 2.5 cubic yards


The normal tolerance for the location of bends and ends of reinforcing bar is: -
ANSWER-+/- 2 inches


How many cubic yards of backfill are required for a 3' x 5' trench, 1500 ft long,
with a 1 foot diameter pipe? - ANSWER-789.72

,Explanation:
Step 1. Find the net face area of the trench deducting for pipe.Face area
including pipe: 3 x 5 = 15 square feetArea of the pipe: 𝐴=𝜋𝑟2A = 3.14 x .5 x .5A
= 0.785Find the face area of the trench minus area of the pipe, which will give
you the net area for the backfill.15 - 0.785 = 14.215Step 2. Find the total
volume of the backfill.14.215 x 1500 = 21322.5 cubic feetConvert the volume
into cubic yards.21322.5 ÷ 27 = 789.72 cubic yards


When can the live load be calculated by multiplying the height, width and
length of a pour and dividing by the deadload? - ANSWER-Never


Tensile strength in concrete is achieved by: - ANSWER-The use of steel
reinforcement.


Refer to the house plan. What is the total cost for the foundation slab if the
contractor charges $3.54 per square foot? - ANSWER-$6524.90


Explanation:
The easiest way to solve for the area of the slab is to image a full rectangle of
the slab and subtract void areas from the area of the slab.


Rectangle area: 28.167' x 71.5'= 2013.94 sq ftLeft void area: 6.667' x 1.83' =
12.2 sq ftCenter void area: 11.5' x 1.83' = 21.045 sq ftRight void area: 9.167' x
15' = 137.505Net area of the foundation slab: 2013.94 - 12.2 - 21.045 - 137.505
= 1843.19 sq ft.Calculate the price of the slab.1843.19 sq ft x $3.54 = $6524.90


What is the minimum spacing of parallel reinforcing bars placed in two or more
layers? - ANSWER-1 inch

, Explanation:
According to the American Concrete Institute, where parallel reinforcement is
placed in two or more layers, bars in the upper layers shall be placed directly
above bars in the bottom layer with clear distance between layers not less than
1 inch.


When applying concrete to concrete there are several factors to consider.
Which is most important? - ANSWER-In most cases the most important is the
bond.


What is the purpose of the rebar? - ANSWER-To increase the tensile strength


There are many ornamental uses of concrete, including casting architectural
elements, ornaments, and faux finishes. How would you describe terrazzo in
the simplest terms? - ANSWER-A special combination of colored rock and glass
for floors.


What is the minimum size of anchor bolt can be used in seismic category E? -
ANSWER-#5


The building code requires 5/8" anchor bolt to be used in seismic category E.


Construction loads are: - ANSWER-The maximum loads to which a structure will
ever be subjected.


In some cases it may be necessary to use stronger or double ties. Why? -
ANSWER-As a safety precaution when workers may need to climb on
reinforcement.


What size of rebar is used to reinforce stem wall? - ANSWER-#4

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller trustednurse. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $25.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78834 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$25.99
  • (0)
  Add to cart