100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Cips L6m5 - Strategic Programme Leadership Lo1 Questions And Answers With Verified Solutions Already Passed $13.99   Add to cart

Exam (elaborations)

Cips L6m5 - Strategic Programme Leadership Lo1 Questions And Answers With Verified Solutions Already Passed

 6 views  0 purchase
  • Course
  • CIPS
  • Institution
  • CIPS

Cips L6m5 - Strategic Programme Leadership Lo1 Questions And Answers With Verified Solutions Already Passed

Preview 3 out of 20  pages

  • October 10, 2024
  • 20
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CIPS
  • CIPS
avatar-seller
classhub
Cips L6m5 - Strategic Programme
Leadership Lo1 Questions And Answers
With Verified Solutions Already Passed
Van Weele purchasing development model - ANSWER✔✔1. Transactional
orientation, serve the factors - supply relationship is reactive, relationship based on
provision of raw materials and components.
2. Commercial orientation, lowest unit price - relationship is based on price
negotiation aimed at achieving lowest prices for the organisation.
3. Co-ordinated purchasing - procurement and supply using uniform policies,
processes and systems. Often bureaucratic and slow to respond to units.
4. Internal integration cross-functional purchasing - relationship becomes more
integrated. Focuses on cross functional problem solving
5. External integration: supply chain-management - Outsourcing strategies
developed with supply chain partners.
6. Value chain orientation - Recognises P&S strategy needs to deliver value to the
end customer, strong relationships encouraged with suppliers.

EPC Contract - ANSWER✔✔An EPC Contract is appealing to the client as a
turnkey solution and a risk mitigation tool - the EPC contractor assumes all of the
responsibilities and risk of completing a programme

EPC Contract vs D&B - ANSWER✔✔Close links between EPC and D&B
contracts - the difference is that the EPC contract requires the contractor the design
and construct a building to a specification where it is capable of producing a
certain level of output.

Mechanical completion - ANSWER✔✔Start up and commissioning of all systems
in a building

Performance Testing - ANSWER✔✔Demonstrates that the building is suitable for
the requirements of a client

Performance Testing - ANSWER✔✔Is important in terms of the programme as it
allow the contractor to avoid LDs or claim bonuses if the programme is completed
early

,provisional acceptance - ANSWER✔✔the client accepts the performance on the
basis that the contractor remains responsible for finding a remedy

Commercial operation - ANSWER✔✔Upon acceptance, the responsibility and
ownership transfers to the client and the Commercial operation of the facility may
commence

EPC contracts - ANSWER✔✔Are:

- Fixed price contracts
- Have a fixed completion date
- Limited contractor claims as all risk is passed to the contractor
- Limits of liability - EPC contractors seek cap

EPC contracts - ANSWER✔✔The biggest risks that the client bares on an EPC
contract is ensuring that the spec is correct, and communicating what is required to
teh contractor

Management Contractor Warranties - ANSWER✔✔Although clients only deal
with one contractor under mgmt. contracting, it may request warranties from the
individual works contractors so that direct claims can be made in the event that
mgmt. contactor becomes insolvent

Statement of need - ANSWER✔✔After a review of the statement of need, it may
be decided that a new progrmme is not needed

Workflow plan for: Management contracting and construction management -
ANSWER✔✔- Business Justification = Statement of need and prepare preliminary
BC
- Feasibility Study = Allows the client to prepare a business case for the proposed
option
- Project Brief = the basis for the design
- Concept Design = the initial idea for the facility design is proposed
- Appointment of Management contractor or construction manager = tender,
framework, referral, interview
- Production information = the info needed for the works contractor to perform the
activities is prepared
- tender works contract = works or trade contracts released for tender
- Mobilisation = SOS after MC is appointed

, - Construction = Contractor /CM assumes control of site
- Occupation and defects liability period = any defects which become apparent
after handover are rectified
- Post occupancy evaluation = review of how successful the programme was

- Business Justification - ANSWER✔✔Statement of need and prepare preliminary
BC

- Feasibility Study - ANSWER✔✔Allows the client to prepare a business case for
the proposed option

Project Brief - ANSWER✔✔the basis for the design

Concept Design - ANSWER✔✔The initial idea for the facility design is proposed

Appointment of Management contractor or construction manager -
ANSWER✔✔via tender, framework, referral, interview

Production information - ANSWER✔✔the info needed for the works contractor to
perform the activities is prepared

tender works contract - ANSWER✔✔works or trade contracts released for tender

Mobilisation - ANSWER✔✔SOS after MC is appointed

Construction - ANSWER✔✔Contractor /Construction Manager assumes control of
site

Occupation and defects liability period - ANSWER✔✔any defects which become
apparent after handover are rectified

Post Occupancy Evaluation - ANSWER✔✔review of how successful the
programme was

Construction Management - ANSWER✔✔Focuses on the administration and
activities relating to trade contracts that are placed with the client.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller classhub. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

84669 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.99
  • (0)
  Add to cart