While assessing a customer's property for a solar system installation, note where any overhead lines are in relationship to the - Answer The installation site When performing a site assessment, it is best to obtain copies of the customer's electric bills for the past - Answer 12 months ...

[Show more]

Preview 2 out of 5  pages

  • October 8, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Solar PV Engineering and Installation
  • Solar PV Engineering and Installation
avatar-seller
TestSolver9
Comp8 PV Midterm Assessement
Questions And 100% Actual Answers.
While assessing a customer's property for a solar system installation, note where any overhead lines are
in relationship to the - Answer The installation site



When performing a site assessment, it is best to obtain copies of the customer's electric bills for the past
- Answer 12 months



When assessing the possibility of installing a solar panel array on a roof, the assessor must determine the
dead load of the roof, which is - Answer the weight of permanent, stationary construction, and
equipment included in a building



Which BOS components are used to tie multiple panels together? - Answer Combiners



The roof ground should be a solid copper conductor with the minimum size of - Answer 6 AWG



The typical distance between the standoff mounted panels and the roof surface is - Answer 3 - 5 inches



Solar panel installation areas need to receive a minimum of how many full hours of sunlight per day for
best performance? - Answer 6 hours



A proposed installation will have 5 rows of 4 panels, each that will be installed lengthwise. If each panel
is 60" long and 26" wide, and the panels are separated by 2", how much space will be needed for the
installation? - Answer 235 sq ft



Ideally, the roof should be replaced prior to PV system installation if a customer expects it to last for less
than - Answer 10 years



A PV system with 2 days of autonomy can support it's essential loads for 2 days without - Answer
dropping below the allowable depth of discharge levels

, Any disconnects for the BOS components need to be easily accessible from the - Answer ground level



All tools and hardware being used on a solar site assessment must be - Answer controlled at all times



The default azimuth angle for locations in the northern hemisphere is - Answer 180 degrees



What is the voltage when current is 20A and the resistance is 12 ohms? - Answer 240 Volts



Which of the following is true regarding a grid-interactive system? - Answer it provides power when
there is a grid outage



What is the resistance when the voltage is 120V and the amperage is 5A - Answer 24 ohms



Which is true regarding parallel circuits? - Answer A parallel circuit provides multiple paths for current
flow



What is the power when current is 20A and voltage is 120V? - Answer 2400W



Wiring solar panels in series - Answer Increases voltage but does not affect amperage



Wiring two 20V/5A solar panel in parallel produces - Answer 20V/10A



Which of the following statements is true regarding PV power? - Answer PV systems help offset power
used during peak demand periods



Which of the following is often the result of repeated temperature cycling? - Answer Burnt Terminals



An 80Ah battery from which 40Ah has been withdrawn has undergone what % depth of discharge? -
Answer 50%

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller TestSolver9. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.79. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

85169 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.79
  • (0)
  Add to cart