DBIA: Principles of Design-Build and Post Award & Contracts Questions With Correct Answers Miller Act 1935 - Answer-Federal Government passed bond requiring payment and performance bonds on all public works, what year? /.Brooks Bill 1972 - Answer-Bill directing A/E's selected on qualificatio...

[Show more]

Preview 2 out of 8  pages

  • October 7, 2024
  • 8
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • dbia principles of design
  • DBIA: Principles of Design-Build and Post Award &
  • DBIA: Principles of Design-Build and Post Award &
avatar-seller
kartelodoc
Miller Act 1935 - Answer-Federal Government passed bond requiring payment and
performance bonds on all public works, what year?

/.Brooks Bill 1972 - Answer-Bill directing A/E's selected on qualifications, what year?

/.Clinger Cohen Act/Defense Procurement Reform Act 1996 - Answer-Allows all federal
agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing
Design-Build.

/.Standard of Care - Answer-The level of quality that any average Design Professional
would be able to perform given the circumstances.

/.Design Bid Build - Answer-Slowest Project Delivery method, linear in nature,
prescriptive (owner knows what they want),

/.Multi Prime - Answer-Project Delivery - Many contracts through Owner

/.CM at Risk - Answer-Project Delivery method allowing the contractor to come on board
very early in design for preconstruction services yet maintains separation between
Designer and Builder contractually.

/.Design Build - Answer-Fastest Project Delivery method, fast tracking possible
overlapping design with construction utilizing incremental packages.

/.Low Bid - Answer-Procurement Method - Most Familiar

/.Negotiated (Qualifications Based) - Answer-Procurement Method - Common for A/E

/.Best Value - Answer-Procurement Method - Qualifications and Price

/.Sole Source - Answer-Procurement Method - Direct

/.Lump Sum - Answer-Contract Format w/ agreed upon fixed price

/.Cost Plus Fee - Answer-Contract Format - contractor reimbursed for actual cost plus
an agreed upon percentage

/.GMP (Guaranteed Maximum Price) - Answer-Contract Format - Combines Cost-Plus &
Lump-Sum, contractor reimbursed for actual cost plus a fee only up to a certain amount.

, /.Unit Price - Answer-Contract Format - cost per piece

/.Target Price - Answer-Contract Format - established cost/benchmark determined
jointly by project team.

/.Trust, Flexibility - Answer-Successful Design Build requires _____ & _______ between
participants

/.Hammurabi - Answer-Singular responsibility for both design & construction was first
codified by ____

/.Bridging Documents - Answer-Owner provided items such as 20% design or more and
provides prescriptive specs at RFP.

/.Spearin Doctrine - Answer-Owner is responsible for implied warranties in the
sufficiency of the specifications.

/.Performance Requirements - Answer-____ ____ should identify end results.

/.Design Build - Answer-Single point of responsibility for both design & construction is
an attribute of what delivery method?

/.Substantiation - Answer-The process of checking milestones along the way for
completeness.

/.Prescriptive - Answer-Owner requiring specific products or methods be instituted by
DB team in order to achieve desired performance.

/.False - Answer-T/F Detailed estimating is the Building systems approach to estimating

/.False - Answer-T/F feasibility estimate is cost model and establishes budget for project

/.True - Answer-T/F key element of quality assurance is keeping communication lines
open between owner and DB

/.True - Answer-T/F in Design/cost relationship of DB, the constructor establishes
design parameters for architect

/.False - Answer-T/F trust is most important thing for DB

/.Schematic estimating - Answer-DB estimating sequence where 15%-20% of design is
completed

/.Trend logs - Answer-Provides baseline budgets and schedules and list estimate trends

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller kartelodoc. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

83637 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart