Amtrak RWP/ RWP PG Combined Set Exam Questions With Verified And Reviewed Answers | Already Passed!!
7 views 1 purchase
Course
Amtrak RWP
Institution
Amtrak RWP
Amtrak RWP/ RWP PG
Combined Set Exam Questions
With Verified And Reviewed
Answers | Already Passed!!
1) A what authorizes movements on controlled track. - ANSWER
Operator/Dispatcher
2) The RWIC is required to be qualified on physical characteristics when
their group is working on...
Amtrak RWP/ RWP PG
Combined Set Exam Questions
With Verified And Reviewed
Answers | Already Passed!!
1) A what authorizes movements on controlled track. - ANSWER
Operator/Dispatcher
2) The RWIC is required to be qualified on physical characteristics when
their group is working on.... - ANSWER All tracks
3) The EIC is an employee who is in charge of.... - ANSWER A work
group
4) The main role of the RWIC is.... - ANSWER To establish on track
safety
5) When can personal electronic devices be used while on duty? -
ANSWER If there is an emergency at the job site and no other forms
of communication are available
,6) Prior to performing any task that requires fouling a track or has the
potential to foul a track, all roadway workers must participate in an.... -
ANSWER on-track safety briefing
7) The safety briefing must be conducted.... - ANSWER At the job
location
8) Whistle boards are required when.... - ANSWER 5 or more
employees are working for more than 1 hour
9) When using foul time with off-track equipment for more than 5
minutes on a main track you must use.... - ANSWER a supplemental
shunting device
10) Local control is used for.... - ANSWER C&S inspections/testing
or joint C&S and MW switch inspection
11) How is a job briefing documented? - ANSWER NRPC 4104
12) When is an on-track safety briefing required? - ANSWER When
performing any task that has potential to foul a track.
13) Who is responsible for establishing on-track safety? - ANSWER
RWIC
, 14) What does foul time ensure for the crew working in the designated
area (working limits)? - ANSWER That no trains will operate within
the working limits
15) What information is provide by the RWIC when requesting foul
time? - ANSWER Name and title, time limits, track designation,
track limits
16) When is the use of an SSD required? - ANSWER Any situation in
which equipment is used for foul time longer than 5 minutes
17) What allows an RWIC to establish ETO(Exclusive Track Occupancy)?
- ANSWER Permission from the dispatcher, flagman stationed at
each entrance of working limits, fixed signals indicating "stop"
18) When are whistle boards required? - ANSWER When working
with 5 or more employees for more than 1 hour
19) Do whistle boards replace watchman? - ANSWER No
20) All movements made on non-controlled track must be made
using.... - ANSWER Restricted Speed
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller NURSINGDICTIONARY. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.99. You're not tied to anything after your purchase.