100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM STUDY GUIDE $9.99   Add to cart

Exam (elaborations)

NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM STUDY GUIDE

 2 views  0 purchase
  • Course
  • Nicet
  • Institution
  • Nicet

EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED FIRST PUBLISH SEPTEMBER 2024 Page 1/10 NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM STUDY GUIDE Acceptance - Answer-The written acceptance by the Department of the Work. acceptance testing - Answer-Testing conduct...

[Show more]

Preview 2 out of 10  pages

  • October 6, 2024
  • 10
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Nicet
  • Nicet
avatar-seller
EmillyCharlotte
EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED
FIRST PUBLISH SEPTEMBER 2024




NICET LEVEL 1 HIGHWAY
CONSTRUCTION EXAM STUDY
GUIDE

Acceptance - Answer✔✔-The written acceptance by the Department of the Work.


acceptance testing - Answer✔✔-Testing conducted by the Department to measure the degree of

compliance to the Contract


actual cost - Answer✔✔-The computed cost using calculations provided


addendum - Answer✔✔-A Contract revision or response to a Contractor inquiry issued after

advertisement and before the opening of bids.


as-built quantity - Answer✔✔-The quantity of a completed Item eligible for payment


authorized funding amount - Answer✔✔-The amount of funds authorized by the Department for the

Contract


Bidder - Answer✔✔-The individual, firm, partnership, corporation, joint venture, or any acceptable

combination thereof that submits a bid to the Department.


bridge - Answer✔✔-. A structure, other than a culvert, including supports, erected over a depression or

an obstruction, such as water, highway, or railway, and having a track or passageway for carrying traffic

or other moving loads and having a length 3 measured along the center of the structure of more than 20




Page 1/10

, EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED
FIRST PUBLISH SEPTEMBER 2024


feet between undercopings of abutments or extreme ends of openings for multiple boxes. Structure

dimensions are defined as follows:


bridge length - Answer✔✔-The overall length measured along the line of survey stationing from back to

back of backwalls of abutments, if present, otherwise end to end of the bridge floor; but, in no case less

than the total clear opening of the structure


bridge width - Answer✔✔-The clear width measured at right angles to the longitudinal centerline of the

bridge between the bottom of curbs, or in the case of multiple height of curbs, between the bottoms of

the lower risers or, if curbs are not used, between inner faces of parapet or railing


Change Order. - Answer✔✔-A written order issued by the Department to the Contractor after execution

of the Contract authorizing one or more of the following: 1. Changes in the Work. 2. Modifications in the

basis of payment. 3. Modifications to Contract Time.


Commercially Useful Function - Answer✔✔-Occurrences in which the subcontractor is responsible for

the execution of a distinct element of the work of a contract and carrying out its responsibilities by

actually performing, managing, and supervising the work involved, and with respect to materials and

supplies used on the contract, prepares the estimate, negotiates price, determines quality and quantity,

orders the material, arranges delivery, installs (where applicable), and pays for the material and supplies

itself for the project.


Completion - Answer✔✔-When all of the following have occurred: 1. The Work has been satisfactorily

completed in all respects according to the Contract. 2. The Project is ready for use by the Department as

required by the Contract. 3. The Contractor has satisfactorily executed and delivered to the RE all




Page 2/10

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller EmillyCharlotte. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81503 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart