100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ESC Inspector Exam Questions With Error- Free Solutions $9.99   Add to cart

Exam (elaborations)

ESC Inspector Exam Questions With Error- Free Solutions

 9 views  0 purchase
  • Course
  • Virginia Erosion and Sediment Control Inspe
  • Institution
  • Virginia Erosion And Sediment Control Inspe

how many times the average rate does a construction site have soil loss - Correct Answer 1,000 times avg. natural soil and 20 times agricultural Federal Water Pollution Control Act - Correct Answer 1. 1948 2.Post WW2 industrial growth led to the pollution of rivers, streams, lakes. 3. Fir...

[Show more]

Preview 2 out of 11  pages

  • September 30, 2024
  • 11
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • eros
  • Virginia Erosion and Sediment Control Inspe
  • Virginia Erosion and Sediment Control Inspe
avatar-seller
Victoria108
ESC Inspector Exam Questions With Error- Free
Solutions
how many times the average rate does a construction site have soil loss - Correct
Answer 1,000 times avg. natural soil and 20 times agricultural

Federal Water Pollution Control Act - Correct Answer 1. 1948
2.Post WW2 industrial growth led to the pollution of rivers, streams, lakes.
3. First U.S law to address water pollution
4. one of the earliest references to clean water as a resource and the importance of
protecting water quality and managed reduction of pollutants flowing into waterways

Virginia studies the issue of sedimentation - Correct Answer 1. 1971
2. fast-paced urban development in Northern Virginia and the Tidewater lead to the
erosion of lands and sediment deposition in waters

Federal Clean Water Act (CWA) - Correct Answer 1. 1972
2. Congress passed major amendments to the federal water pollution control act that
became known as the clean water act (CWA)
3. Established basic structor for regulating polluntant discharges into the waters of the
U.S
4. Newly created EPA and established National pollutant discharge elimination system
permit program

Erosion and Sediment Control Law - Correct Answer 1. 1973
2. VA General assembly passed the ESC law, requiring statewide establishment of
minimum standards, guidelines, and criteria for the effective control of soil erosion,
sediment deposition, and non-agricultural runoff
3. Law requires all counties and cities in VA to adopt a local erosion program by July 1,
1974

Virginia Stormwater Management Act - Correct Answer 1. 1989
2. SWM Act passed to address water pollution, stream channel erosion, depletion of
groundwater resources, and more frequent localized flooding that occurs due to
intensive land development

Adoption of ESC regulations - Correct Answer 1. 1990
2. order to improve the program structure and consistency
3. General Assembly required the soil and water conservation Board to promulgate
regulations for the administration, implementation, and enforcement of the ESC law

The Integration Bill - Correct Answer 1. 2012 (effective July 1, 2014)
2.VA house bill 1065 passed, making significant changes to the ESC law and the SWM
act to align the two programs
3. required that all countries, cities, and towns with regulated municipal separate storm
sewer system (MS4) programs adopt and administer a local stormwater program

, 4.creating statewide stormwater management program that operates at the local level,
much like what was already the case for the erosion program.

Umbrella of ESC and SWM - Correct Answer includes the following:
erosion and sediment control, flood insurance (if applicable), flood plain management,
and Chesapeake Bay Preservation Act (if applicable)

Effects of Stormwater runoff - Correct Answer 1. Sediment - removal of vegetation
during construction makes soil susceptible to erosion. This erosion and resulting
sediment transport often lead to water pollution
2. other Pollutants - Stormwater runoff can also pickup and transport construction
related waste and other pollutants that can contaminate waterways and property
3.Post construction runoff - even after construction, stormwater runoff remains a
concern. addition of impervious surfaces, such as imperious surfaces, such as
pavement and roofs, decreases a sites ability to infiltrate rainwater

Stormwater runoff - Correct Answer always a concern
such as vehicle wash rack, concrete washout, and rain garden

Regulatory Requirements - Correct Answer ESC law requires the staff of a program
authority to obtain and maintain a certificate of competency in the area of erosion and
sediment control. Anyone who is contracted by a program authority to perform any or all
of the functions of that authority must also obtain and maintain a certificate of
competency

Roles of the program staff - Correct Answer There are four potential roles for a
locality's erosion program staff. The following items are generally the day-to-day duties
of each position.

Program administrator - Correct Answer 1. Ensures plan review and approval,
inspections, and enforcement actions are conducted in accordance with the ESC law,
regulations, and local ordinances
2. Completes reports to be sent to DEQ Coordinates enforcement proceedings
3. Keeps records, collects fees, and updates local ordinances as needed Additionally,
the program administrator also ensures that other positions, such as inspectors and
plan reviewers, are certified

Inspector - Correct Answer 1. Conducts regular inspections of active construction sites
to ensure proper construction, function, and maintenance of erosion and sediment
control measures
2. Documents inspections
3. Initiates enforcement action when needed
4. Ensures compliance to correct deficiencies or violations

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Victoria108. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

83637 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart