100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
HSI FINAL EXAM TEST QUESTIONS AND ANSWERS COMPLETE RATED A. $15.49   Add to cart

Exam (elaborations)

HSI FINAL EXAM TEST QUESTIONS AND ANSWERS COMPLETE RATED A.

 2 views  0 purchase
  • Course
  • HSI,
  • Institution
  • HSI,

HSI FINAL EXAM TEST QUESTIONS AND ANSWERS COMPLETE RATED A.

Preview 4 out of 39  pages

  • September 30, 2024
  • 39
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • HSI,
  • HSI,
avatar-seller
saraciousstuvia
HSI FINAL EXAM TEST QUESTIONS AND
ANSWERS COMPLETE RATED A.
If a Balancing Authority is unable to purchase capacity or energy to meet
its demand and reserve requirements on a day-ahead or hour-by-hour
basis, which entity (or entities), is it expected to notify?


•All Reliability Coordinators and marketers
•All Reliability Coordinators
•Transmission Operators
•lts Reliability Coordinator and other Balancing Authorities
Verified Answer -•lts Reliability Coordinator and other Balancing
Authorities


Why are high transmission system voltages a problem during system
restoration ?


•Because of shunt reactors that were left in service after the system
collapse
•Because of insufficient MVAR supply from generators that tripped off
•Because of the excessive MVAR supply from generators
•Because of the excessive MVAR supply from energizing transmission
lines
Verified Answer -•Because of the excessive MVAR supply from
energizing transmission lines


A Balancing Authority anticipating an operating capacity or energy
emergency shall perform all actions necessary . including 1 ) bringing on

,all available generation 2 ) postponing equipment return . scheduling
interchange sales being prepared to reduce firm load


•2 and 3
•1 and 2
•1 and 4
•3 and 4
Verified Answer -•1 and 4


If a circuit breaker does not have a synch - check , reclosing relay and has
a large standing phase angle across it , how can the system operator know
if it is safe to close the breaker avoiding shock torque to the neighboring
generators ?


•Ask the generator operators to change reactive to a leading power factor
and then check the frequency
•Use the synchroscope in the substation control room as a guide to show
you how to adjust the system to improve the phase angle
•lf the voltage is within +/- 10 % it is OK to close the breaker
•Obtain help from the Regional operating committee engineers to advise
you .
Verified Answer -•Use the synchroscope in the substation control room as
a guide to show you how to adjust the system to improve the phase angle


A Balancing Authority anticipating a capacity or energy deficiency
emergency, shall perform which of the actions


•load shedding

,•voltage reduction
•transmission line switching
•all necessary actions
Verified Answer -•all necessary actions


How often should the Transmission Operator and Balancing Authority
review and update their Loss of Control Room Functionality Operating
Plan


•Every two years
•Every three years
•Annually
•As needed
Verified Answer -•Annually


During a system restoration , what is the system operators priority


•Restoration of interchange
•Restoration of off - site startup power to generating facilities
•Restoration of customer load •Interconnection frequency
Verified Answer -•Restoration of off - site startup power to generating
facilities


When synchronizing sections of the transmission system that have
separated or islanded , frequency and voltage magnitude on each side of
the breaker and the power angle across the breaker must be within proper
limits . To bring these values within proper limits , the system operator
should _______________?

, •Adjust the power angle on one side of the breaker to 90 degrees
•Adjust the tap changer on the nearest transformer
•Open additional lines until the voltage is matched
•Adjust generator MW and MVAR output in one of the areas
Verified Answer -•Adjust generator MW and MVAR output in one of the
areas


The initial response to a frequency deviation is due to which of the
following
1. Load / frequency response
2. AGC
3. Governor action
4. Interchange schedules


•3 and 4
•1 and 2
•2 and 3
•1 and 3
Verified Answer -•1 and 3


EMS and AGC have failed at 12:25 and generation must be controlled
manually. The operator calculates ACE to be +25 MWs. Load is expected
to increase 100 MWs, and imports will increase by 75 MWs at the top of
the hour. What should the operator do?


•Maintain current generation level

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller saraciousstuvia. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79373 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.49
  • (0)
  Add to cart