100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Mobile Crane Questions Test #2 $11.49   Add to cart

Exam (elaborations)

Mobile Crane Questions Test #2

 1 view  0 purchase
  • Course
  • Mobile Crane
  • Institution
  • Mobile Crane

Mobile Crane Questions Test #2

Preview 2 out of 5  pages

  • September 24, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Unknown
  • Mobile Crane
  • Mobile Crane
avatar-seller
tutorWADE
Mobile Crane Questions Test #2



When making a multiple crane lift it is important for the operator to understand that: - CORRECT
ANSWER : The weight may increase if the other crane lands the load.


If a crane is not set-up level and the operator swings a load from the high side, the load radius will: -
CORRECT ANSWER : Increase.


Most crane manufacturers reduce load capacity for duty-cycle operations because: - CORRECT
ANSWER : Side-loading forces may occur.


On whose recommendations should preventative maintenance program be set-up: - CORRECT
ANSWER : C rane manufacturer.


What is the standard rope used on most cranes? - CORRECT ANSWER : Right regular lay.



The proper way to calibrate a boom angle indicator is: - CORRECT ANSWER : Using a level, raise the
boom horizontal and set the indicator at 0º.



The red area of a instrument gauge means: - CORRECT ANSWER : A dangerous condition exists.



The best way to keep people from being injured from the counterweight of

crane is to: - CORRECT ANSWER : Fence or barricade the tail swing area of the crane.



Only approved attachments or extra counterweights made by the manufacturer should be placed on the
rear of the crane because: - CORRECT ANSWER : They could cause a backward stability problem.



What is the first thing an operator should do before going under a low pipe rack? - CORRECT ANSWER
: Post a signal person to check clearance.

, When working on outriggers, the only time they should be less than fully extended is when: - CORRECT
ANSWER : There is a load chart for this operation.


When lifting loads from the water, the operator should be aware that: - CORRECT ANSWER : The load
will increase when you pick the load from the water.



What is required to be on a hydraulic crane in order for it to lift a manbasket? - CORRECT ANSWER :
Boom length indicator.



When working on rubber, cranes are rated at what percentage of tipping? - CORRECT ANSWER : 75%



When using cable or nylon spreaders it is important to remember: - CORRECT ANSWER : The lower the
spreader angle to the horizontal, the greater the tension.



Backward stability of a crane is tested with: - CORRECT ANSWER : Basic boom at maximum angle with
no load.



If not listed in the load/capacity charts for the hydraulic crane and you are in between boom lengths, you
should:: - CORRECT ANSWER : Use the next longer or shorter length (the lower capacity).



When spinning the load presents a danger, the operator should: - CORRECT ANSWER : Use a tagline.



The jib capacity is 8 tons and the ball weight 900 lbs. What is the heaviest net load that can be lifted
safely? - CORRECT ANSWER : 15,100.



Parts of line means: - CORRECT ANSWER : The number of lines running through the load block.



If a jib is erected but not being used, it is treated as a deduction from the cranes: - CORRECT ANSWER :
Gross capacity.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller tutorWADE. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76462 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart