Certified Mobile Crane Operator Prep Test Questions and Answers 100% CorrectCertified Mobile Crane Operator Prep Test Questions and Answers 100% CorrectCertified Mobile Crane Operator Prep Test Questions and Answers 100% CorrectCertified Mobile Crane Operator Prep Test Questions and Answers 100% Co...
Certified Mobile Crane Operator
Prep Test Questions and Answers
100% Correct
Where must the operator's manual be kept during crane operations? - ANSWER -
The operator's manual should always be kept in the cab
according to ASME B30.5, what are the minimal requirements to meet the crane
operator qualifications? - ANSWER - Physical, Written test, Practical Test
which will have the greatest effect to the fulcrum of a crawler crane and have a
major impact on capacity? - ANSWER - working over the rear
what hand signal must always be obeyed? - ANSWER - Stop
When removing pins or bolts from a boom, assembly, workers shall remain? -
ANSWER - out from under the boom
when may a crane be overloaded? - ANSWER - Never
what is the purpose of a boom length indicator? - ANSWER - to provide the actual
boom length at the time of use.
when can the operator leave the crane? - ANSWER - after securing the crane
when can a crane be side loaded - ANSWER - with a freely suspened load
the deflection of a boom will cause the load to? - ANSWER - increase the radius
, what are the broken wire removal requirements for rotation resistant wire rope? -
ANSWER - 2 broken wires in 6 diameters or 4 in 30 diameters
how should wire rope be inspected during a frequent or shift inspection? - ANSWER -
visually
what is the object of rope lubrication? - ANSWER - prevent corrosion and reduce
internal friction (a and b)
which inspection has a competent person making records of the inspection? -
ANSWER - Month
when should tag lines be used? - ANSWER - when the rotation of the suspended load
becomes hazardous
what shall be in the operator's cab during crane operations? - ANSWER - load charts
which of the following is considered duty-cycle work? - ANSWER - clamshell digging.
when doing the duty cycle work, most manufactures require the crane's capacity to
be reduced by? - ANSWER - 20%
which components are not parts of the boom? - ANSWER - Heel pins
the boom angle on a lattice boom crane, is the angle between? - ANSWER - The
ground and the centerline of the boom, between the sheaves and the heel pins.
Three short audible signals means? - ANSWER - Back-up
According to ANSI B30.5, hand signal chart shall be posted where? - ANSWER - On
the job site
a signal person shall be? - ANSWER - A designated person, tested and qualified
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller NursingTutor1. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $11.99. You're not tied to anything after your purchase.