100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
IEC SEMESTER 1 Y3 FINAL QUESTIONS AND ANSWERS WELL ILLUSTRATED. $11.99   Add to cart

Exam (elaborations)

IEC SEMESTER 1 Y3 FINAL QUESTIONS AND ANSWERS WELL ILLUSTRATED.

 6 views  0 purchase
  • Course
  • IEC
  • Institution
  • IEC

IEC SEMESTER 1 Y3 FINAL QUESTIONS AND ANSWERS WELL ILLUSTRATED. "as-built" - correct answer. According to the BCES specs, a set of drawings is to be maintained at the jobsite for the purpose of recording the final size, location and interrelation of work as the job progresses. This se...

[Show more]

Preview 2 out of 6  pages

  • September 19, 2024
  • 6
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • IEC
  • IEC
avatar-seller
techgrades
IEC SEMESTER 1 Y3 FINAL
QUESTIONS AND ANSWERS WELL
ILLUSTRATED.


"as-built" - correct answer. According to the BCES specs, a set of drawings is to be
maintained at the jobsite for the purpose of recording the final size, location and
interrelation of work as the job progresses. This set of __ drawings is used to indicate
the location of equipment, including concealed conduit and equipment.

specific to a particular project - correct answer. Written specifications are __.

innerduct - correct answer. BCES specs require that all fiber optic backbone cable
shall be installed in __.

more information about some aspect of the project - correct answer. On a construction
project, an RFI is used to obtain __.

electricial contractor - correct answer. According to the BCES specs, damage repairs
to the factory painted finish of electrical equipment is the responsibility of the __.

The architect provides written approval - correct answer. You can deviate from the
specs if __.

installed in conduit - correct answer. The BCES spec require cafeteria sound system
cable installed above sheetrock ceiling to be __.

6 - correct answer. The BCES Specs require that convenience receptacles be
installed at a height of __ inches above counter tops or back splashes.

the project manager - correct answer. On a construction project, PM is the designation
for ___.

, electrical - correct answer. Prior to construction, the __ electrical contractor is
responsible for verifying that conductors have sufficient ampacity to serve equipment
furnished by the MC.

8'-0" - correct answer. The concrete contractor will build the BCES light pole bases so
that the bottom of the concrete is at a depth of __ below the top of grade or paving.

44' 7 3/4" - correct answer. You are going to set a 1900 box north of column line F.5
on the bottom of the 1st bar joist east of the beam on column line 11. Then you are
going to run EMT due east on the bottom of the bar joists and hit joists that are installed
as shown and the 1900 boxes are centered under the bar joists, you should need __ of
EMT to run between the two boxes in a straight line.

120.00 - correct answer. Adjacent to the BCES property, the width of the right-of-way
across FM Hwy 646 is __ feet.

1" = 50' - correct answer. The scale used on the BCES utility plan is __.

30 - correct answer. Re: S1.2. A typical section is cut through the exterior wall. See
1/S4.1. Conduit will be run underground out to the site lighting. It will originate within the
building. It will be routed between the piers. The top of the conduit must be at least __
below the finished floor to pass under the grade beams.

16 - correct answer. The height of the beam along column line F.5 that spans between
columns 11 & 12.9 is __".

unsuitable - correct answer. Dirt (soil) on a site may be required to be removed and
replaced if the soil is deemed __.

1" =50" - correct answer. The scale used on the BCES Survey drawing in the plans is
__

True - correct answer. RE: S1.2. A typical section is cut through the exterior wall. See
1/S4.1. The floor slab will be 6" thick.

5 1/2 - correct answer. Re: S1.2. A typical section is cut through the exterior wall. See
1/S4.1. There will be a " -wide brick ledge along the top of the grade beam.

I or II only - correct answer. A benchmark is typically placed by a __ firm.
I. government agency
II. private survey
III. earth moving

all of these - correct answer. A site plan is used to __.
a. locate lot lines
b. place the building

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller techgrades. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

83750 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.99
  • (0)
  Add to cart