100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Mobile Crane Review Exam Questions with Correct Answers $18.49   Add to cart

Exam (elaborations)

Mobile Crane Review Exam Questions with Correct Answers

 4 views  0 purchase
  • Course
  • Nccer mobile crane
  • Institution
  • Nccer Mobile Crane

What is the purpose of placing mats or cribbing under or cribbing under outrigger floats? - Answer-Distribute the force over a larger area. Where is the best location for leveling a crane? - Answer-Upperworks. (A revolving frame of equipment on which operating machinery are mounted along operato...

[Show more]

Preview 3 out of 20  pages

  • September 16, 2024
  • 20
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Nccer mobile crane
  • Nccer mobile crane
avatar-seller
lectknancy
Mobile Crane Review Exam Questions
with Correct Answers
What is the purpose of placing mats or cribbing under or cribbing under outrigger floats?
- Answer-Distribute the force over a larger area.

Where is the best location for leveling a crane? - Answer-Upperworks. (A revolving
frame of equipment on which operating machinery are mounted along operator's can)

Before leveling a mobile crane on outriggers, an operator should ensure: - Answer-
There is no weight of the crane bearing on any tires.

Operating a mobile crane with a long boom, on uneven ground, what support condition
should be considered? - Answer-Keeping a 90 degree angle between cylinder rod and
pad.

When may blocking (cribbing) be placed under outrigger beams on mobile cranes? -
Answer-Never approved.

Mobile cranes should be level to within what percent of grade? - Answer-1 %

Timber crane mats work best when they are: - Answer-Bolted together

When arriving in the crane at the job site, the operator should first determine the
condition of the: - Answer-Access roads

What surface listed below would Not be a good location for assembly or setup of a
mobile crane? - Answer-A. Above compacted fill
B. Above highway asphalt
C. Above underground vaults
D. Above highway concrete

Each outrigger pad and its blocking should be sufficient to support? - Answer-The total
weight of the crane and its load.

How does high wind affect a mobile crane with a long boom? - Answer-Introduces side
load onto the boom

When is the only time the outrigger beams should be less than fully extended? -
Answer-The load chart indicates that this is allowed (always make sure that it is safe
first)

What is the primary purpose for a rooster sheave or auxiliary boom point sheave? -
Answer-separate the load hoist lines.

,Eccentric main boom tip reeving causes which of the following: - Answer-twisting of the
main boom

which type of wire rope listed below is installed on MOST cranes?

a. right regular lay
b. right alternate lay
c. left regular lay
d. left alternate lay - Answer-a. right regular lay

The hoist drum flange shall extend a minimum of _______ over the top layer of wire
rope at all times while crane is in operation.

a. 1/2 inch
b. 1 inch
c. 1 1/2 inch
d. 2 inch - Answer-1/2 inch

Which type of wire rope listed below is installed on most cranes?

a. main hoist line
b. boom hoist line
c. Auxiliary hoist line
d. pendant line - Answer-pendant line

when lifting on outriggers, the floats or pads should always be:

a. sufficient to support three times the applies load
b. raised to touch the tires firmly on the ground
c. secured to the outriggers cylinder
d. secured to the mats - Answer-secured to the outriggers cylinder

on a mobile crane, how many broken wires are permitted at the connection of a pendant
before it must be taken out of service?

a. 6
b. 5
c. 3
d. 1 - Answer-1

How many randomly broken wires in a lay length must there be on a mobile cranes
hoist line, before it should be removed from service?

a. 4
b. 3

, c. 5
d. 6 - Answer-6

what is the minimum design (unless rotation resistant) factor required for a right regular
lay, boom or hoist wire rope?

a. 5
b. 3.5
c. 2.5
d. 7 - Answer-3.5

Type 1 rotation resistant hoist wire rope has a design factor of:

a. 2.5 to 1
b. 3 to 1
c. 3.5 to 1
d. 5 to 1 - Answer-5 to 1

it is important to know when lubricating crane hoist wire rope, that the lubricant must:

a. not hinder visual inspection
b. not be applied in direct sunlight
c. not be applied prior to use
d. not be applied to regular lay wire rope - Answer-not hinder visual inspection

how often is the competent person required to inspect the running wire ropes on a
mobile wire?

a. each shift
b. each year
c. each week
d. each month - Answer-each shift

On mobile cranes, how many broken wires must be present in one strand of one lay for
running wire rope removed from service?
A. 3
B. 1
C. 2
D. 0 - Answer-3

How many randomly distributed broken wires in rotation-resistant hoist wire ropes
considered for replacement?

A. 1 broken wire in 6 rope diameters
B. 2 broken wires in 30 rope diameters
C. 3 broken wires in one strand in one lay

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller lectknancy. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $18.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

80467 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$18.49
  • (0)
  Add to cart