100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
AMT2 Exam Questions and Answers 2024 $10.99   Add to cart

Exam (elaborations)

AMT2 Exam Questions and Answers 2024

 9 views  0 purchase
  • Course
  • AMT 2
  • Institution
  • AMT 2

AMT2 Exam Questions and Answers

Preview 2 out of 7  pages

  • September 16, 2024
  • 7
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • AMT 2
  • AMT 2
avatar-seller
UPPERFRONT
AMT2 Exam Questions and Answers
AC HOLD - Answer -A term used to describe the restriction on the movement of AC
electric trains or engines within a specified area. Generally issued by the Amtrak load
dispatcher or power Director to a train dispatcher.

ARC - Answer -A luminous and potentially destructive flash or flame in or about the
wires, third rail, or electric apparatus caused by the passage of electric current through
the air.

Authorized - Answer -Permission to work on or about an electric circuit apparatus or
equipment or give them permission to enter substations frequency converter stations or
electrical enclosures.

Authorized work area - Answer -The area established by the class a employee where
Work may be performed.

Auto drop - Answer -A feature that will automatically lower the pantagraph when the air
system to the pantagraph has been compromised.

Autoreclose - Answer -A feature of the electrification between New Haven and Boston.
this feature or attempt to automatically close a trolley circuit breaker one time upon fault

Autotransformer - Answer -Transformer a power transformer with only one winding that
is used to boost voltage.

Autotransformer feeder - Answer -A feeder adjacent to the catenary that utilizes auto
transformers to maintain the catenary voltage at selected points.

Auxiliary wire - Answer -A solid wire suspended from the messenger wire to which the
contact wire is attached.

Balance weight assembly - Answer -A system of cables, pulleys, and weights at the end
of a tensioning section used to maintain constant tension in the catenary.

Broken pantographs/carbon alarm (BPA) - Answer -An alarm generated when the air
system to the pantagraph has been compromised.

Bus jumper - Answer -A cable used to transmit high voltage power between
pantographs and/or one unit of electrical equipment to another.

, Catenary isolation system - Answer -A system used to de energized and ground the
catenary at terminal or service an inspection location, made up of catenary disconnect
switches and catenary ground switches.

circuit - Answer -The complete path over which electric current is transmitted from and
returned to its source.

Circuit breaker/interrupter - Answer -A device which normally operates automatically
under conditions of overload, short circuit, or by remote control to energize or D
energize transmission lines, signal powerlines, catenary, third rail, or primary circuits on
electrical equipment so equipped.

class A - Answer -Weinman, substation electricians, third rail man, and C&S employees
who are trained and qualified to provide protection services as well as work on or about
the electrification system.

Class "a" et trainee - Answer -ET trainees who have pass there 12 month test and class
a qualification

Class "a" qualified list - Answer -A list of employees qualified in a defined territory to
receive clearances. The assistant division engineer - ET maintains a current list of class
"a" et employees. The assistant division engineer-C&S maintains a current list of clase
C&S employees

Class "b" - Answer -Mechanical department personnel trained to perform work on top of
electric equipment in electrified territory under the condiditons authorized in these
instructions, for their protection only.

Class "c" - Answer -Personnel qualified to perform work in electrified territory.

Clearance - Answer -The procedure when it is determined that power must be removed
from circuits or apparatus and electrified territory is governed by minimum approach
distances

Collector head assembly - Answer -Part of the pantagraph made up of a set of carbon
strips and and horns connected to the main frame of the pantagraph assembly by
means of an Apex

Contact wire - Answer -The wire in the Cattenari form which the pantagraph collects
current

Continuity jumper - Answer -An electrical connection in the overhead contacts system; a
short conductor installed to provide electrical continuity. A jumper cable of carrying full
line current.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller UPPERFRONT. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

72042 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart