100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Lean Six Sigma Yellow Belt Exam Questions with Correct Answers $15.49   Add to cart

Exam (elaborations)

Lean Six Sigma Yellow Belt Exam Questions with Correct Answers

 8 views  0 purchase
  • Course
  • Six Sigma Yellow Belt Certification
  • Institution
  • Six Sigma Yellow Belt Certification

1-1. What does DMAIC stand for? A. Define, Measure, Analyze, Implement, Continue B. Develop, Metrics, Attributes, Identify, Control C. Define, Measure, Analyze, Implement, Control D. Define, Measure, Analyze, Improve, Control - Answer-1. D Define, Measure, Analyze, Improve, Control are the...

[Show more]

Preview 2 out of 11  pages

  • September 11, 2024
  • 11
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Six Sigma Yellow Belt Certification
  • Six Sigma Yellow Belt Certification
avatar-seller
lectknancy
Lean Six Sigma Yellow Belt Exam
Questions with Correct Answers
1-1. What does DMAIC stand for?

A. Define, Measure, Analyze, Implement, Continue
B. Develop, Metrics, Attributes, Identify, Control
C. Define, Measure, Analyze, Implement, Control
D. Define, Measure, Analyze, Improve, Control - Answer-1. D

Define, Measure, Analyze, Improve, Control are the 5 phases.

1-2. What is the objective of a Six Sigma project?

A. Reduce Variation
B. Reduce Variation and/or Shift the Mean
C. Shift the Mean
D. Eliminate waste - Answer-1-2. B

Depending on the project, Six Sigma can be used to both shift the mean and reduce
variation.

1-3. True or False: A Six Sigma Yellow Belt is equipped to lead a complex Six Sigma
project.

A. True
B. False - Answer-1-3. B

False. Six Sigma Yellow Belts are trained to lead localized projects and do not possess
the subject matter expertise to lead a complex project.

1-4. True or False: Keeping the Y=f(x) equation in mind, in order to improve a process,
focus should be placed on Y rather than the X's.

A. True
B. False - Answer-1-4. B

False. In order to see a shift in the Y metric, concentration must be placed on the X's.

1-5. True or False: Each phase of the Six Sigma DMAIC method has specific
deliverables that must be satisfied before moving into another phase.

A. True
B. False - Answer-1-5. A

, True. Each phase of DMAIC has specific tools and techniques that must be completed
with the Six Sigma Core Team and/or extended stakeholders in order to successfully
close out a phase.

2-1. Which of the following process maps is constructed in the Define Phase?

A. Detailed Process Map
B. Value Stream Map
C. Cross-Functional Map
D. SIPOC / COPIS - Answer-2-1. D

The SIPOC / COPIS is created during Define with the others in Measure and/or
Analyze.

2-2. True or False: When gathering the Voice of the Customer (VOC), both internal and
external stakeholders should be considered.

A. True
B. False - Answer-2-2. A

True. All perspectives of the process, product, or service in question should be
considered from both customer types.

2-3. True or False: When gathering the VOC, a VOC Plan should be completed by the
Six Sigma Belt leading the project.

A. True
B. False - Answer-2-3. B

False. The VOC Plan must be constructed with the entirety of the Six Sigma Core
Team.

2-4. True or False: The CTQ Tree is constructed using the VOC as input, which is then
translated into characteristics and attributes that can be measured.

A. True
B. False - Answer-2-4. A

True. The VOC serves as the pivot point, providing valuable insight into necessary
process characteristics needed to satisfy the VOC.

2-5. True or False: The Cost of Poor Quality Iceberg is important as it tells an
organization to focus on the issues and challenges which are already visible.

A. True

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller lectknancy. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67163 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.49
  • (0)
  Add to cart