ICC Vapor Recovery 1 Pt. 2 Questions with
Answers
1. Under Dispenser Containment is required to be designed and constructed in
accordance with ____.
a. the appropriate Executive Order
b. Generally accepted secondary containment practices
c. standards of an independent testing organization with industry code
d. an engineering specification approved by a state registered professional
engineer or engineering standard - Correct Answer c. standards of an
independent testing organization with industry code
2. With a Gilbarco Vapor-Vac, the OPW 12VW nozzle has a hole or tear in the
vapor escape guard, it is a defect if ____% of the circumference is missing.
a. 25%
b. 75%
c. 50%
d. 65% - Correct Answer b. 75%
3. Gasoline three sealant can be used on all except _____.
a. threaded portion of rotatable adaptors
b. p/v valve
c. ball float
d. riser adaptor - Correct Answer a. threaded portion of rotatable adaptors
4. when installing copper tubing use all except _____.
a. copper tubing cutter
b. copper bending tool
c. copper flaring tool
d. copper stretching tool - Correct Answer d. copper stretching tool
5. The Husky P/V valve has a torque range of...
a. 50-75 lbs
b. 20-50 lbs
c. 30-50 lbs
d. 40-50 lbs - Correct Answer b. 20-50 lbs
, 6. When installing the hanging hardware together use...
a. pipe dope
b. non-hardening sealant
c. teflon tape
d. oil or grease - Correct Answer d. oil or grease
7. When installing in the EO VR-101-E you should have on site _____.
a. the executive order
b. phil-tite installation manual
c. the equipment checklist
d. all the above - Correct Answer d. all the above
8. There are four ball valves on the clean air separator, what position are they to be
in?
a. top and bottom valve open, the rest are closed
b. top and bottom valve closed, the rest are open
c. top valve open, the rest are closed
d. bottom valve open, the rest are closed - Correct Answer c. top valve
open, the rest are closed
9. The drop tube used in EO #VR-101-E is the
a. OPW 61SO-PT
b. Phil-Tite 61SO-PT
c. EBW 61SO-PT
d. VST 61SO-PT - Correct Answer b. Phil-Tite 61SO-PT
10. When reconnecting a breakaway after a drive off you must
a. be a certified technician
b. log the incident into the GDF maintenance log
c. call the local air district
d. call 911 - Correct Answer b. log the incident into the GDF maintenance
log
11. Per CCR, Title 23 UST Regulations, the minimum capacity of a spill bucket is
_____ gallons
a. 5
b. 3 1/2
c. 7
d. 10 - Correct Answer a. 5
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Besttutor90. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $17.99. You're not tied to anything after your purchase.