100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NC Building Contractor License exam questions with correct answers $16.49   Add to cart

Exam (elaborations)

NC Building Contractor License exam questions with correct answers

 4 views  0 purchase
  • Course
  • General Contractor License
  • Institution
  • General Contractor License

NC Building Contractor License exam questions with correct answers

Preview 4 out of 42  pages

  • September 2, 2024
  • 42
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • General Contractor License
  • General Contractor License
avatar-seller
Fordenken
NC Building Contractor License exam
questions with correct answers

The |______asummes |the |entire |responsibility |under |the |contract |- |ANSWERS✔✔ |Prime |
Contractor



The |______ |asummes |responsibility |with |respect |to |his |portion |of |the |work |- |ANSWERS✔✔ |
Sub |Contractor



Safety |Belts |shall |be |a |min |of |1/2 |inch |nylon |and |not |allow |a |fall |greater |than |____ |- |
ANSWERS✔✔ |6ft



Safety |Nets |must |extend |_____ |beyond |the |end |of |work |surface |- |ANSWERS✔✔ |8ft



Safety |Nets |must |be |positioned |no |more |than |_____ |below |work |surface |- |ANSWERS✔✔ |25ft



Heaters |must |not |be |located |within |______ft |of |tarps, |canvas |or |similar |coverings |- |
ANSWERS✔✔ |10ft



Material |Storage |: |Materials |shall |not |be |stored |within |____ |ft |of |an |exterior |wall |- |
ANSWERS✔✔ |10ft



Materaial |Storage |: |Brick |stacks |shall |not |be |more |than |_____ft |in |height |- |ANSWERS✔✔ |7ft



Material |Storage |: |When |masonry |blocks |are |stacked |higher |than |_____ |ft |the |stack |shall |be |
tapered |back |1 |half |block |per |tier |above |the |____ft |line |- |ANSWERS✔✔ |6ft

,Material |Storage |: |Lumber |Piles |shall |not |exceed |______ft |in |height |(mechanically) |- |
ANSWERS✔✔ |20ft



Material |Storage |- |Lumber |piles |shall |not |exceed |_____ |in |height |(manually) |- |ANSWERS✔✔
|16ft




A |chute |is |required |if |waste |material |is |dropped |more |than |_____ft |outside |exterior |walls |of |
building |- |ANSWERS✔✔ |20ft



How |far |do |you |Lap |Durawire |- |ANSWERS✔✔ |8 |Inches



workers |in |_____ |spaces |must |be |provided |a |lifeline/safety |belt |- |ANSWERS✔✔ |Confined



means |a |suspension |scaffold |consisting |of |a |platform |supported |by |two |essentially |horiztonal |
& |parallel |ropes |attached |to |structural |members |of |a |building |or |other |structure |- |
ANSWERS✔✔ |Catenary |Scaffold



employer |ensures |that |employees |who |wear |presc |lenses |while |engaged |in |operations |
needing |eye |protection |- |ANSWERS✔✔ |Prescription |Lenses



Maximum |height |of |a |masonry |pier |used |in |a |seismic |zone |is |_____ |- |ANSWERS✔✔ |12ft



means |a |suspension |scaffold |consisting |of |a |braced |platform |resin |on |two |parallel |bearers |& |
hung |from |overhead |supports |by |ropes |of |fixed |length |- |ANSWERS✔✔ |Float |(Ship) |Scaffold



The |leading |reason |for |erosion |and |sediment |conrol |plan |failure |is |_____ |- |ANSWERS✔✔ |
Lack |Of |Maintenance



To |clean |masory |use |_______ |- |ANSWERS✔✔ |Potable |Water |& |Detergents

,No |Masonry |shall |be |supported |on |______ |or |other |forms |of |_____ |construction |- |
ANSWERS✔✔ |Wood |Girders |: |Wood



_______ |Shall |be |anchored |to |masonry |walls |with |1/2" |diameter |bolts |6ft |on |center |or |
equivalent. |Bolt |shall |extend |& |be |embedded |at |least |_____ |in |the |masonry |- |ANSWERS✔✔ |
Roof |Diaphragms |: |15 |Inches



Minimum |thickness |of |a |parapet |wall |- |ANSWERS✔✔ |8 |Inches



Maximum |spacing |of |light |gauge |studs |- |ANSWERS✔✔ |24 |Inches



Mechanicla |connections |shall |have |the |bars |connection |to |develop |in |tension |or |compression |
as |least |125% |of |the |yield |strength |of |the |bar |- |ANSWERS✔✔ |TRUE



Is |a |hardhat |required |with |a |jack |hammer? |- |ANSWERS✔✔ |No



What |is |preferred |safety |traffic |marker? |- |ANSWERS✔✔ |42" |Reflectorized |Barrell |or |Drum



What |is |used |to |measure |soil |bearing |capactiy? |- |ANSWERS✔✔ |A |penetrometer



Lap |durawire |8 |inches |- |ANSWERS✔✔ |Lap |durawire |8 |inches



Unreinforced |masonry |parapet |wall |heights |shall |not |exceed |_____ |their |thickness |- |
ANSWERS✔✔ |3 |times



Minimum |thickness |of |a |masonry |bearing |wall |- |One |Story |- |ANSWERS✔✔ |6 |Inches

, Minimum |thickness |of |a |masonry |bearing |wall |- |More |than |One |Story |- |ANSWERS✔✔ |8 |
inches



There |shall |be |at |least |one |metal |tile |for |each |______ |of |wall |area |- |ANSWERS✔✔ |4.5 |Sq |Ft



Vertical |Spacing |on |Metal |Wall |Tie |- |ANSWERS✔✔ |24 |Inches



Horiztonal |Spacing |on |Metal |Wall |Tie |- |ANSWERS✔✔ |36 |Inches



The |minimum |compressive |strength |for |a |carport |slab |in |severe |exposure |zone |is |_____ |- |
ANSWERS✔✔ |3500 |PSI



hand |held |power |tools |(circular |saw, |chain |saw |& |percussion |tools) |require |a |constant |
pressure |switch |that |will |_____the |power |when |pressure |is |released |- |ANSWERS✔✔ |Shut |Off



Compressed |air |shall |not |be |used |for |cleaning |purposes |except |where |reduced |to |less |than |
_____ |PSI |- |ANSWERS✔✔ |30 |PSI



Only |employees |who |have |been |____ |in |the |operation |of |the |particular |tool |in |use |shall |be |
allow |to |operate |powder |actuated |tools |- |ANSWERS✔✔ |Trained



All |Portable, |power |driven |_____ |shall |be |equipped |with |guards |above |and |below |the |base |
plate |or |shoe |- |ANSWERS✔✔ |Circular |Saws



Compressed |gas |cylinders |shall |be |secured |in |an |______ |position |at |all |times |- |ANSWERS✔✔
|Upright




Oxygen |Cylinders |and |fuel |cylinders |must |be |stored |a |minimum |of |____ |and |when |in |inside |
_____ |from |combustible |materials |- |ANSWERS✔✔ |20 |Ft

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Fordenken. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $16.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

80796 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$16.49
  • (0)
  Add to cart