WGU C215 Question and answers already passed 2024 WGU C215
ABC Classification - correct answer a method for determining level of control and frequency of review of inventory items
Acceptable Quality Level (AQL) - correct answer The small percentage of defects that consumers are willing to...
WGU C215
ABC Classification - correct answer ✔a method for determining level of
control and frequency of review of inventory items
Acceptable Quality Level (AQL) - correct answer ✔The small percentage of
defects that consumers are willing to accept.
Acceptable Sampling - correct answer ✔The process of randomly inspecting
a sample of goods and deciding whether to accept the entire lot based on the
results
Action Bucket - correct answer ✔The current time period
Action Notices - correct answer ✔Output from an MRP system that identifies
the need for an action to be taken.
Activity-on-node - correct answer ✔network diagramming notation that
places activities in the nodes and arrows to signify precedence relationships
Advertising Revenue Model - correct answer ✔Provides users with
information on services and products and provides an opportunity for
suppliers to advertise.
Affiliate Revenue Model - correct answer ✔companies receive a referral fee
for directing business to an affiliate
,Aggregate Plan - correct answer ✔Includes the budgeted levels of finished
products, inventory, backlogs, workforce size, and aggregate production rate
needed to support the marketing plan.
ALDEP - correct answer ✔Computer software packages for design process
layouts
Allowance Factor - correct answer ✔the amount of time the analyst allows
for personal time, fatigue, and unavoidable delays
Alternative Workplace - correct answer ✔brings work to the worker rather
than the worker to the workplace
Anticipation Inventory - correct answer ✔inventory built in anticipation of
future demand
Application Service Provider (ASP) - correct answer ✔sets up and runs ERP
systems
Appraisal Costs - correct answer ✔Costs incurred in the process of
uncovering defects
Assemble-to-order Strategy - correct answer ✔produces standard
components that can be combined to customer specifications
Assignable causes of variation - correct answer ✔Causes that can be
identified and eliminated.
,Attributes - correct answer ✔A product characteristic that has discrete value
and can be counted
Automated order entry system - correct answer ✔A method using telephone
models to send digital orders to suppliers
Automation - correct answer ✔Using machinery to perform work without
human operators
Average number of jobs in the system - correct answer ✔measures work-in-
process inventory
Average outgoing quality (AOQ) - correct answer ✔The expected proportion
of defective items that will be passed to the customer under the sampling
plan.
Back orders - correct answer ✔unfilled customer orders
Back-order - correct answer ✔Delaying delivery to the customer until the
item becomes available.
Backward integration - correct answer ✔Owning or controlling sources of raw
materials and components.
backward scheduling - correct answer ✔scheduling method that determines
when the job must be started to be done on the due date
Balance Delay - correct answer ✔The amount by which the line efficiency
falls short of 100 percent.
, Batch processes - correct answer ✔A type of process used to produce a
small quantity of products in groups or batches based on customer orders or
specifications.
Behavioral Feasibility - correct answer ✔degree to which the job is
intrinsically satisfying to the employee
Beliefs that help define JIT Philosophy - correct answer ✔Broad view
operations, simplicity, continuous improvements, visibility, and flexibility
Benchmarking - correct answer ✔The process of studying the practices of
companies considered 'best-in-class' and comparing your company's
performance against theirs.
Best operating level - correct answer ✔The volume of output that results in
the lowest average unit cost.
beta probability distribution - correct answer ✔typically represents project
activities
Bill of Material (BOM) - correct answer ✔lists all the subassemblies,
component parts, and raw materials that go into an end item and shows the
usage quantity of each required
Block Plan - correct answer ✔schematic showing the placement of resources
in a facility
Bottleneck - correct answer ✔Longest Task in the process
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller flyhigher329. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $13.49. You're not tied to anything after your purchase.