WGU C215 Operations Management Question and answers 100% correct 2024 WGU C215 Operations Management -Objective Assessment Prep Guide & Terminologies Combo Study Guide 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process m...

[Show more]

Preview 4 out of 87  pages

  • August 31, 2024
  • 87
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • WGU C215
  • WGU C215
avatar-seller
flyhigher329
WGU C215 Operations Management -
Objective Assessment Prep Guide &
Terminologies Combo Study Guide
1. customer focus
2. continuous improvement
3. employee empowerment
4. use of quality tools
5. product design
6. process management
7. managing supplier quality - correct answer ✔Total Quality Management
(TQM) Philosophy


Basic function of Six Sigma. Measures the process potential and performance
of processes. The higher the range of Cpk, the improved is the ability of the
process to complete its necessities. Uses both the process variability and the
process specifications to determine whether the process is "capable." - correct
answer ✔Process Capability Index (Cpk)


A disciplined, data-driven approach and methodology for eliminating defects
(driving toward six standard deviations between the mean and the nearest
specification limit) in any process - from manufacturing to transactional and
from product to service. - correct answer ✔Six Sigma


The theoretical maximum output of a system in a given period under ideal
conditions. - correct answer ✔Design Capacity


The capacity a firm expects to achieve given its current operating constraints.
- correct answer ✔Effective Capacity

,proximity to customers, transportation, source of labor, community attitude,
proximity to suppliers, and many other factors. - correct answer ✔Location
Analysis


A type of process used to produce a large volume of a standardized product. -
correct answer ✔Line Processes


A type of process used to produce a small quantity of products in groups or
batches based on customer orders or specifications. - correct answer
✔Batch Processes


A type of process used to make a one-at-a-time product exactly to customer
specifications. - correct answer ✔Project Processes


A type of process that operates continually to produce a high volume of a fully
standardized product. - correct answer ✔Continuous Processes


Longest task in the process. - correct answer ✔Bottleneck


A type of automated system that combines the flexibility of intermittent
operations with the efficiency of continuous operations. - correct answer
✔Flexible Manufacturing System (FMS)


A technique for monitoring the flow of jobs between work centers. - correct
answer ✔Output/Input Control


The net increase created during the transformation of inputs into final outputs.
- correct answer ✔Value-Added

,Layouts that combine characteristics of process and product layouts. - correct
answer ✔Hybrid Layouts


Table that reflects opinions of managers with regard to the importance of
having any two departments close together. - correct answer ✔Relationship
Chart (REL)


The shortest distance between two locations using north-south and east-west
movements. - correct answer ✔Rectilinear Distance


Table that gives the number of trips or units of product moved between any
pair of departments. - correct answer ✔From-To Matrix


Schematic showing the placement of resources in a facility. - correct answer
✔Block Plan


The average of the observation times for each of the work elements. - correct
answer ✔Mean Observed Times


The mean observed time multiplied by the performance rating factor by the
frequency of occurrence. - correct answer ✔Normal Time


The length of time it should take a qualified worker using appropriate process
and tools to complete a specific job, allowing time for personal fatigue and
unavoidable delays. - correct answer ✔Standard Time


A philosophy designed to achieve high-volume production through elimination
of waste and continuous improvement. Based on a "pull" system rather than a

, "push" system. The three elements are just-in-time manufacturing, total quality
management, and respect for people. - correct answer ✔Just-in-Time (JIT)


A card that specifies the exact quantity of product that needs to be produced. -
correct answer ✔Kanban card


A philosophy of neverending improvement. - correct answer ✔Continuous
Improvement


Supplies materials or services directly to the processing facility. - correct
answer ✔Tier One Suppliers


Directly supplies materials or services to a tier one supplier in the supply
chain. - correct answer ✔Tier Two Suppliers


Directly supplies materials or services to a tier two supplier in the supply
chain. - correct answer ✔Tier Three Suppliers


Management of the flow of materials from suppliers to customers in order to
reduce overall cost and increase responsiveness to customers. - correct
answer ✔Supply Chain Management (SCM)


Determines the labor and machine resources needed to fill the open and
planned orders generated by the MRP. - correct answer ✔Capacity
Requirements Planning (CRP)


A system that uses the MRP, inventory record data, and BOM to calculate
material requirements. - correct answer ✔Material Requirements Planning
(MRP)

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller flyhigher329. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart