100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
COSC 275 Exam 1 Palmer Solved 100% $11.49   Add to cart

Exam (elaborations)

COSC 275 Exam 1 Palmer Solved 100%

 2 views  0 purchase
  • Course
  • COSC 275
  • Institution
  • COSC 275

COSC 275 Exam 1 Palmer Solved 100%

Preview 2 out of 10  pages

  • August 28, 2024
  • 10
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • COSC 275
  • COSC 275
avatar-seller
LUCKYSTAR2022
COSC 275 Exam 1 Palmer Solved 100%
____ ______ are used when the load from columns or walls is very high. They combine
all loads into one mat thereby eliminating differential settlement between individual
footings. Many of the high-rise buildings in downtown Houston are supported by these
foundations. - ANSWER-Mat Foundations

_____ _____ or Caissons are a cast in place foundations which distribute loads through
skin friction and/or bearing. - ANSWER-Drilled Shafts

_____ ______ are used to spread the load of columns or walls over an area large
enough to reduce the load per square foot below the bearing capacity of the soil. This
type of system may be used when the bearing layer of soil is within 10' of the surface.
This is known as a shallow foundation system. - ANSWER-Spread Footings

_____ foundations transfer heavy loads to underlying strata that is too deep to utilize
spread footings or mat foundations. - ANSWER-Pile

_____ stabilization can be used beneath roadways to chemically change the clay soil so
it's less reactive with water. - ANSWER-Lime

______ Damages are daily fees used to punish a GC for every day they run over the
project completion date. - ANSWER-Liquidated

______ structures are supported by a non-expansive layer of earth, like bedrock. -
ANSWER-Isolated

_____-set concrete is a type that hardens quickly but is relatively very weak. -
ANSWER-Flash

(T/F) Multi Prime contracts, where the owner has a separate contract with each party, is
common with fast tracking. - ANSWER-True

1 CY = ___ CF - ANSWER-27 CF

1 mile = _____ feet - ANSWER-5,280 Ft

1 SY = ___ SF - ANSWER-9 SF

2 types of Elevations: - ANSWER-Architecture (FF) and Mean Seal Level (MSL) aka
FFE

4 types of foundation systems: - ANSWER-1)Spread Footings
2) Mat foundations
3)Pile Foundations

, 4)Drilled Shafts

A _____ prime contract is most common, where the owner contracts a GC who then
contracts a SC. - ANSWER-Single

A ______ ______ is the first option to be removed from the plans if a budget cut is
needed to reduce cost of project. - ANSWER-Deductive Alternate

A safety factor of __ is generally used for supporting load limits. - ANSWER-3

Addendum: - ANSWER-A document describing an addition, change, correction, or
modification to contract documents. An addendum is issued by the design professional
during the bidding period or prior to the award of contract, and is the primary method of
informing bidders of modifications to the work during the bidding process. Addenda
become part of the bidding process.

After a waste allowance is made, the quantities are called _____ ___________. -
ANSWER-Gross Quantities

Amendment: - ANSWER-A modification of the contract by a subsequent agreement.
This does not change the entire existing contract but does alter the terms of the affected
provisions or requirements.

Area Method: - ANSWER-A construction cost estimating system employing unit square
foot costs multiplied by the adjusted gross floor area of a building.

Area of a circle: - ANSWER-πr²

Area of triangle: - ANSWER-(1/2)bh

Area: - ANSWER-A measurement of a given planar region or of the surface of a solid.

Before a waste allowance is factored, the quantities are called ____ __________. -
ANSWER-Net Quantities

Belled Pier Length & Overburden calc: - ANSWER-

Blows per feet: - ANSWER-Tests bearing capacity of rock

Board feet for a 2x8 x 16' long: - ANSWER-2 x 8 x 16 /12 = 21.33 Board Feet

Board feet: - ANSWER-TxWxL / 12

Bolster: - ANSWER-in concrete, an individual or continuous support used to hold
reinforcing bars in position. usually used in slab work.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller LUCKYSTAR2022. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76658 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart