ICC Vapor Recovery 1 Test with
__., __., __., __., __., _
complete solutions.
_., __., __.,
When removing liquid from a sump or spill bucket and the liquid contains
__., __., __., __., __., __., __., __., __., __., __., __.,
fuel, it must ____?
__., __., __., __.,
A. be managed as hazardous waste
__., __., __., __., __.,
B. pumped into a bucket to evaporate
__., __., __., __., __., __.,
C. scooped or bailed onto the concrete pad to evaporate
__., __., __., __., __., __., __., __., __.,
D. put into a sealed container, then put into the trash container
__., __., __., __., __., __., __., __., __., __., __., __.,__., A.
__., __.,
be managed as hazardous waste
__., __., __., __.,
Before working on any electrical circuits always de-energize and use
__., __., __., __., __., __., __., __., __., __.,
A. NFPA__.,
B. OSHA__.,
C. ICC __.,
D. UBC __., __.,__., __., A. NFPA __.,
Which of the following is not considered "hanging hardware"?
__., __., __., __., __., __., __., __.,
a. nozzle
__.,
b. swivel
__.,
,c. whip hose
__., __.,
d. shear valve
__., __., __.,__., __., d. shear valve
__., __.,
Per Executive Order. VR-201-E, if the dispensing vacuum of the Healy VP-
__., __., __., __., __., __., __., __., __., __., __.,
1000 pump is below ____ inches of WC, the dispenser should be remove
__., __., __., __., __., __., __., __., __., __., __., __.,
d from service.
__., __.,
A. 50
__.,
B. 60
__.,
C. 75
__.,
D. 100
__., __.,__., __., B. 60 __.,
In a coaxial hose for a balance system, the product flows through the __
__., __., __., __., __., __., __., __., __., __., __., __., __.,
__?
A. the belllows
__., __.,
B. the inner hose
__., __., __.,
C. the outer hose
__., __., __.,
D. both hoses
__., __., __.,__., __., B. the inner hose
__., __., __.,
Per the Vapor Recovery Equipment Defects List (VRED), the ____ of any c
__., __., __., __., __., __., __., __., __., __., __., __.,
omponent required to be used by the system's EO. Is not considered a d
__., __., __., __., __., __., __., __., __., __., __., __., __.,
efect.
A. absence
__.,
B. proper installation
__., __.,
, C. disconnection
__.,
D. improper installation
__., __., __.,__., __., B. proper installation
__., __.,
The three elements in a fire triangle are ____?
__., __., __., __., __., __., __., __.,
A. oxygen, fuel, & LEL
__., __., __., __.,
B. fuel, fire, & carbon dioxide
__., __., __., __., __.,
C. fuel, oxygen, & ignition source
__., __., __., __., __.,
D. ignition source, carbon dioxide, & fuel
__., __., __., __., __., __., __.,__., __., C. fuel, oxygen, & ignition
__., __., __., __., __.
source
,
According to PEI RP-300, a combustible gas indicator is used to?
__., __., __., __., __., __., __., __., __., __.,
A. determine carbon dioxide levels
__., __., __., __.,
B. monitor benzene, toluene, & ethyl benzene levels
__., __., __., __., __., __., __.,
C. determine the (UEL) upper explosion limit of gasoline
__., __., __., __., __., __., __., __.,
D. detect vapor leaks in the vapor recovery system
__., __., __., __., __., __., __., __., __.,__., D. detect vapor l
__., __., __., __.,
eaks in the vapor recovery system
__., __., __., __., __.,
Per CP-201, liquid traps in the dispenser vapor piping are:
__., __., __., __., __., __., __., __., __.,
A. Not allowed
__., __.,
B. Allowed only with an assist system
__., __., __., __., __., __.,
C. Allowed if approved by CARB
__., __., __., __., __.,
D. Allowed when hoses with liquid removal systems are used
__., __., __., __., __., __., __., __., __.,