100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ELECTRICAL LEVEL 2 MODULE 9 GROUNDING AND BONDING QUESTIONS AND ANSWERS WITH SOLUTIONS WITH SOLUTIONS 2024 $13.99   Add to cart

Exam (elaborations)

ELECTRICAL LEVEL 2 MODULE 9 GROUNDING AND BONDING QUESTIONS AND ANSWERS WITH SOLUTIONS WITH SOLUTIONS 2024

 6 views  0 purchase
  • Course
  • NCCER
  • Institution
  • NCCER

ELECTRICAL LEVEL 2 MODULE 9 GROUNDING AND BONDING QUESTIONS AND ANSWERS WITH SOLUTIONS WITH SOLUTIONS 2024

Preview 1 out of 4  pages

  • August 27, 2024
  • 4
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NCCER
  • NCCER
avatar-seller
Performance
ELECTRICAL LEVEL 2 MODULE 9
GROUNDING AND BONDING
QUESTIONS AND ANSWERS WITH
SOLUTIONS WITH SOLUTIONS 2024
Where there is a requirement to add a second grounding electrode, the two electrodes must be
separated at - ANSWER least 6 feet apart.



the unintentional electrically conducting connection between an ungrounded conductor, of an electrical
circuit and the normally noncurrent-carrying conductors, metallic enclosures, metallic equipment, or the
earth - ANSWER A Ground Fault =



When a main bonding jumper is required by the NEC,the jumper - ANSWER cannot be less than 12.5% of
the area of the largest phase conductor.



A grounding test utilizing an earth ground resistance tester known as the 3-point method. - ANSWER the
3-point method.



Grounding electrode conductor ( or neutral ) is what connects to the neutral terminal bus of a main
panel. - ANSWER Grounding electrode conductor



If single-gang nail-on non-metallic boxes are used with NM cable, which of the following is true ? -
ANSWER No connection to the box is required



Grounding requirements for AC SYSTEM are contained in NEC Section 250.20 and 250.21. - ANSWER
Section 250.20 and 250.21.



An acceptable grounding electrode is - ANSWER the Metal frame of a building which is effectively
grounded.



Ultimately, the ground fault is cleared - ANSWER when the Overcurrent devices are opened.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Performance. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81531 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.99
  • (0)
  Add to cart