Before developing a project plan, it is important to (CH3) Answer - have a clear
understanding of the scope of work
A scope statement should include: (CH3) Answer - Both in-scope and out-of-
scope items
The key elements of a project should be driven by: (CH3) Answer - the client's
need
What is a dependency within a project task schedule? (CH3) Answer - A task
that cannot begin before another task has been completed
Project budget refers to what? (CH3) Answer - The amount of labor and
materials the project manager has allocated to complete the project.
A primary reason for attending construction meetings is to: (CH3) Answer -
Identify changes to the original design that will affect the av installation.
In the event of a change in the placement of air-conditioning ducts in a
boardroom, which of the following documents should the AV integrator submit
first? (CH3) Answer - RFI
Which of the following documents should an AV integrator submit in the event
that a manufacturer has discontinued a projector model? (CH3) Answer - RFC
, The ANSI/INFOCOMM 2M-2010 Standard Guide for AV Systems Design and
Coordination Process lays out a procedure for determining the_________ (CH3)
Answer - project communication that needs to take place on a given project.
After which of the following activities is an AV project completed? (CH3)
Answer - System closeout activities are completed
Which set of drawings should you reference to view the ductwork that goes
through the building? Answer - Mechanical Drawings
Which set of drawings should you reference to locate a power outlet for a
video display? Answer - Electrical Drawings
Which of the following must the as-built drawings show? Answer - Details of
the system as finally installed
OFOI Answer - Owner Furnished Owner Installed (you will not need to install)
What does an elevation flag on a plan drawing indicate? Answer - Related
elevation drawings
What type of drawing would you use to find out exactly how the projector
should be mounted to the ceiling? Answer - Detail Drawing
Which of the following is the AV team likely to perform during new
construction? Answer - • Install sprinkler system
• Run cables and install mounts - Answer
• Mount drop ceiling
• Build the firewall
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller EvaTee. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $14.99. You're not tied to anything after your purchase.