100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
COSC 275 Exam 1 Palmer Questions and Answers $11.99   Add to cart

Exam (elaborations)

COSC 275 Exam 1 Palmer Questions and Answers

 7 views  0 purchase
  • Course
  • Cosc
  • Institution
  • Cosc

COSC 275 Exam 1 Palmer Questions and Answers

Preview 2 out of 10  pages

  • August 24, 2024
  • 10
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Cosc
  • Cosc
avatar-seller
millyphilip
COSC 275 Exam 1 Palmer Questions and
Answers

Estimating: - Answer -The process of determining the anticipated cost of materials,
labor, and equipment of a proposed project.

Take-off: - Answer -The process in which detailed lists are compiled, based on drawings
and specifications, of all the material and equipment necessary to construct a project.
The cost estimator uses this list to calculate how much it will cost to build the project.

Quantities: - Answer -Measured amounts of construction items expressed in their
customary units.

Quantification: - Answer -In estimating an activity to translate project scope information
into resource quantities suitable for costing. In the engineering and construction
industry, a takeoff is a specific type of quantification that is a measurement and listing of
quantities of materials from drawings.

Quantity survey: - Answer -A detailed analysis of material and equipment required to
construct a project.

Area: - Answer -A measurement of a given planar region or of the surface of a solid.

Area Method: - Answer -A construction cost estimating system employing unit square
foot costs multiplied by the adjusted gross floor area of a building.

Length: - Answer -The longest dimension of an object.

Linear measurement: - Answer -A unit or system of units for measuring length: 12" = 1',
3' = 1 yard, 1 yard = 0.9144 meters, 1 mile = 5,280 feet.

Dimension: - Answer -A distance between two points, lines, or planes.

Specifications or specs: - Answer -Documents that define the qualitative requirements
for products, materials, and workmanship upon which the contract for construction is
based.

, Drawings: - Answer -Graphic illustrations depicting the dimensions, design, and location
of a project. Generally including plans, elevations, details, diagrams, schedules, and
sections. The Term, when capitalized refers to the graphic portion of a project's contract
documents.

Addendum: - Answer -A document describing an addition, change, correction, or
modification to contract documents. An addendum is issued by the design professional
during the bidding period or prior to the award of contract, and is the primary method of
informing bidders of modifications to the work during the bidding process. Addenda
become part of the bidding process.

Amendment: - Answer -A modification of the contract by a subsequent agreement. This
does not change the entire existing contract but does alter the terms of the affected
provisions or requirements.

Grade: - Answer -1. The surface or level of the ground.
2. A classification of quality as, for instance, in lumber.
3. The existing or proposed ground level or elevation on a building site or around a
building.
4. The slope or rate of incline or decline of a road, expressed as a percent.
5. A designation of a subfloor, either above grade, on grade, or below grade.
6. In plumbing, the slope of installed pipe, expressed in the fall in inches per foot length
of pipe.
7. The classification of the durability of brick.
8. Any surface prepared to accept paving, conduit, or rails.

Level: - Answer -1. A term used to describe any horizontal surface that has all points at
the same elevation and thus does not tilt or slope.
2. In surveying, an instrument that measures heights from an established reference.
3. A spirit level, consisting of small tubes of liquid with bubbles in each. The small tubes
are positioned in a length of wood or metal that is handheld and, by observing the
position of the bubbles, used to find and check level surfaces.

Site: - Answer -The location of the project geographically, usually defined by legal
boundaries.

Elevation: - Answer -A vertical distance relative to a reference point.
2. A view or drawing of the interior or exterior of a structure as if projected onto a
vertical plane.

Cut and fill: - Answer -An operation commonly used in road building and other rock and
earthmoving operations in which the material excavated and removed from one location
is used as fill material at another location.

Fill: - Answer -The soil or other material used to raise the grade of a site area.
2. A subfloor leveling material.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller millyphilip. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82191 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.99
  • (0)
  Add to cart