Exam (elaborations)
NERC TEXT QUESTIONS WITH MULTIPLE CHOICES ANSWERS
NERC TEXT QUESTIONS WITH MULTIPLE CHOICES ANSWERS
[Show more]
Preview 3 out of 22 pages
Uploaded on
August 24, 2024
Number of pages
22
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
nerc text questions with multiple choices answers
operating reserve may be provided by which of the
which of the following is the responsibility of a
Institution
NERC
Course
NERC
$14.99
100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached
NERC TEXT QUESTIONS
WITH MULTIPLE
CHOICES ANSWERS
Operatingjreservejmayjbejprovidedjbyjwhichjofjthejfollowing?
A.jLTCs
B.jCapacitorjbanks
C.jVoltagejregulators
D.jInterruptiblejloadsj-jcorrectjanswer-D.jInterruptiblejloads
Whichjofjthejfollowingjisjthejresponsibilityjofjajreservejsharingjgroupj(RSG)?
A.jComplyingjwithjDCSjasjifjitjwasjajsinglejcontroljarea
B.jProvingjregulationjservicejforjneighboringjRSGs
C.jEnsuringjeachjcontroljareajinjthejgroupjmaintainsj50%jblackstartjcapability
D.jComplyingjwithjthejcontroljperformancejstandardsjasjifjitjwasjajsinglejcontroljareaj-
jcorrectjanswer-A.jComplyingjwithjDCSjasjifjitjwasjajsinglejcontroljarea
Generationjisjnotjsufficientjtojmeetjload,jthejcontroljareajisjimportingjheavily,jandjvoltag
ejisjdecaying,jwhichjofjthejfollowingjactionsjshouldjbejtakenjbyjthejoperator?
A.jShedjload
B.jCorrectjschedulejdeviation
C.jUsejthejInterconnectionjHotline
D.jSchedulejinterchangejtransactionj-jcorrectjanswer-A.jShedjload
Whatjmeasuresjpowerjflowjdatajbetweenjcontroljareas?
A.jOASIS
B.jInterchange
C.jTransactions
D.jTie-Linejmeteringj-jcorrectjanswer-D.jTie-Linejmetering
Transmissionjlinejremovaljasjajvoltagejcontroljcanjbejusedjif:
,A.jLoopjflowjremainsjhigh
B.jReactivejequipmentjisjavailable
C.jReliabilityjstaysjatjacceptablejlevels
D.jSynchronousjcondensersjarejoffjthejlinej-jcorrectjanswer-
C.jReliabilityjstaysjatjacceptablejlevels
ControljAreajAjisjgeneratingjandjsendingjControljAreajBjajschedule.jBothjcontroljareasj
shouldjverifyjalljofjthejfollowingjEXCEPT:
A.jMagnitudej(MW)
B.jRampjrate
C.jPrice
D.jStart/stopjtimesj-jcorrectjanswer-C.jPrice
ThejAGCjcontroljmodejthatjisjnormallyjusedjforjsystemjoperationjis:
A.jFlatjTiejMode
B.jFlatjFrequencyjMode
C.jFrequencyjBiasjMode
D.jTiejLinejBiasjModej-jcorrectjanswer-D.jTiejLinejBiasjMode
Therejhasjbeenjajwide-
areajdisturbance.jThejtransfersjthroughjthejsystemjhavejincreasedjandjtherejisjajpossib
ilityjthatjlossjofjonejmajorjtiejlinejwouldjcausejcorrespondingjloadingjandjvoltagejdeviati
ons.jHavingjsystemjresourcesjavailable,jthejsecurityjcoordinatorjshould:
A.jIncreasejgenerationjtojreducejflowsjacrossjthejties
B.jImplementjschedulejchangesjacrossjthejhour
C.jImplementjajvoltagejreductionjplan
D.jAdvisejthejsupervisorj-jcorrectjanswer-
A.jIncreasejgenerationjtojreducejflowsjacrossjthejties
Whenjreferringjtojtransmissionjlinesjofjanjinterconnectedjnetwork,jneighboringjsystems
jshouldjuse:
A.jOwnjlinejidentifiersjandjratings
B.jNERCjlinejidentifiersjandjratings
C.jRegionjlinejidentifiersjandjratings
D.jUniformj(common)jlinejidentifiersjandjratingsj-jcorrectjanswer-
D.jUniformj(common)jlinejidentifiersjandjratings
Tojwhatjleveljshouldjajcontroljareajmaintainjitsjownjreactivejreserves?
A.j105%jvoltagejlevel
B.j95%jvoltagejlevel
C.jFirstjcontingencyjconditions
D.jSecondjcontingencyjconditionsj-jcorrectjanswer-C.jFirstjcontingencyjconditions
Whichjloadjsheddingjstepjshouldjbejimplementedjfirstj(perjPolicyj6B)?
A.jManual
B.jUnderfrequency
C.jRatejofjvoltagejdecay
D.jRatejofjfrequencyjdecayj-jcorrectjanswer-A.jManual
, Betweenjsending,jreceiving,jandjintermediaryjcontroljareas,jwhatjisjthejminimumjinfor
mationjpertainingjtojanjinterchangejschedulejthatjmustjbejconfirmed?
j1.jThejschedulingjpathj&jmagnitudejofjthejtransaction
j2.jThejStart/stopjtimes,jrampjtimes,jandjduration
j3.jPricejofjenergy
j4.jLossjaccountingjincludingjMVARjatjpointsjofjreceiptjandjdelivery
A.j1jandj2
B.j1jandj4
C.j2jandj3
D.j3jandj4j-jcorrectjanswer-A.j1jandj2
ControljareasjshalljNOTjoperatejtojcausejanyjotherjsystemjtojviolatejestablishedjoperat
ingjreliabilityjcriteriajfromjchangesjmadejto:
A.jInterchangejschedules
B.jCapacitorjbanks
C.jReactors
D.jLTCsj-jcorrectjanswer-A.jInterchangejschedules
PerjPolicyj4,j4A,jInjorderjtojpredictjthejsystem'sjnearjtermjloadjpattern,jajsystemjoperat
orjmustjhavejinformationjincludingjweatherjforecastsjand:
A.jSufficientjmetering
B.jPastjloadjpatterns
C.jProjectedjloadjpatterns
D.jGeneratorjoverhauljschedulesj-jcorrectjanswer-B.jPastjloadjpatterns
Alljofjthejfollowingjelectricjsystemjsecurityjdatajarejtojbejupdatedjatjleastjeveryj10jminut
esjEXCEPT:
A.jOperatingjreserve
B.jControljareajdemand
C.jAreajcontroljareajfrequency
D.jForecastjchangesjonjequipmentjstatusj-jcorrectjanswer-
D.jForecastjchangesjonjequipmentjstatus
SecurityjCoordinatorjAjrequestsjReliabilityjCoordinatorjBjtojcurtailjajtransactionjfromjBjt
ojC.jThejReliabilityjCoordinatorjBjshouldjdojwhichjofjthejfollowing:
A.jAskjAjtojredispatch
B.jHonorjthejrequest
C.jImplementjvoltagejreduction
D.jCoordinatejwithjregionaljofficej-jcorrectjanswer-B.jHonorjthejrequest
ThejNERCjcertificationjexaminationjprogramjshouldjcomplyjwithjthejstandardsjestablis
hedjbyjwhichjofjthejfollowing?
A.jNationaljCommissionjforjCertifyingjAgencies
B.jAmericanjNationaljStandardsjInstitute
C.jAmericanjSocietyjofjTestingjMaterials
D.jNationaljBureaujofjStandardsj-jcorrectjanswer-
A.jNationaljCommissionjforjCertifyingjAgencies
SystemjoperatorjtrainingjprogramjcriteriajshouldjbejbasedjuponjalljofjthejfollowingjEXC
EPT: