ICC Soils Certification Exam Questions with all Correct Answers A P.I that is greater than 15 is considered as what? - ANSWER-a material that has expansive potential .according to the IBC, what is the contractor responsible for? - ANSWER-coordinating with special inspectors, the building offic...

[Show more]

Preview 2 out of 15  pages

  • August 21, 2024
  • 15
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ICC Soils Certification
  • ICC Soils Certification
avatar-seller
stuviaunmatched
ICC Soils Certification Exam Questions
with all Correct Answers
A P.I that is greater than 15 is considered as what? - ANSWER-a material that has
expansive potential

.according to the IBC, what is the contractor responsible for? - ANSWER-coordinating
with special inspectors, the building official, and the RDP

schedules the preconstruction meeting

coordinates the on-site special inspection activities

.at the end of a project the special inspector should - ANSWER-submit a final report

.at the end of a project, who should the special inspector submit the final report to? what
shall it state? - ANSWER-the building department stating that all items requiring special
inspection and testing by the statement of special inspections are in conformance with
the approved plans and specifications

.at the job site the special inspector should - ANSWER-Notify contractor personnel of
the presence and responsibilities at the job site

follow site requirements for safety and sign in

observe the assigned work

perform or observe required testing

report on nonconforming items immediately ( any discrepancies)

provide timely progress reports ( on a daily or weekly basis determined by the building
official)

.before an observation is complete what should the special inspector record? -
ANSWER-each location of inspection

type of inspection

frequency of inspection

note any nonconforming items on the discrepancies report and give it to the contractor

document any changes , requests for information (RFI) or email corrections to the
construction process

, .Clayey gravels; poorly graded gravel-and-clay mixes - ANSWER-GC

.Clayey sands; poorly graded sand-clay mixes - ANSWER-SC

.do all excavations including trenches that are less the 5 feet deep need to be examined
by a special inspector? - ANSWER-absolutely yes

.during fabrication who will review the quality control documentation and alert the
manufacturer to any discrepancies? - ANSWER-The special inspector

.for compaction, when water content increases what happens to the dry density -
ANSWER-it will become denser until a certain point is reached , at which point the
density will begin to decrease.

.for concrete construction when is special inspection required? - ANSWER-replacement
placing and post placement inspections
compared concrete to document requirements
collects concrete samples to be tested for strength
verifies temp and moisture requirements are met

.for gravelly soils or crushed stone how thick of lifts should be placed? - ANSWER-10 to
12 inches , compacting to about 8 inches

.for progress reports, when should the special inspector complete them? - ANSWER-on
a timely basis as determined by the building official

.foundation grades and drainage must dos - ANSWER-surface water must be directed
away from the foundation area and not be permitted to stand within or adjacent to the
work

foundations must have and adequate concrete reveal of 4 to 8 inches before the top of
the soil is encountered

areas around the foundation must slope away to a swale or drainage pipe system that
will drain adequately off site

slopes should have approximately 6- inch fall within 10 feet from building on all sides for
all buildings, including residence

.foundation red lights - ANSWER-design not in accordance with geotechnical
recommendations

foundation location differs from site investigation location

foundation plans not adequate or complete

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller stuviaunmatched. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $6.29. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

80796 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$6.29
  • (0)
  Add to cart