100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CSLB Concrete C8 License Practice Test #1 Latest Update Questions and 100% Verified Correct Answers Actual Exam Guaranteed A+ Brand NEW!!!!!!! $20.99   Add to cart

Exam (elaborations)

CSLB Concrete C8 License Practice Test #1 Latest Update Questions and 100% Verified Correct Answers Actual Exam Guaranteed A+ Brand NEW!!!!!!!

 9 views  0 purchase
  • Course
  • CSLB Concrete C8 License Practic
  • Institution
  • CSLB Concrete C8 License Practic

CSLB Concrete C8 License Practice Test #1 Latest Update Questions and 100% Verified Correct Answers Actual Exam Guaranteed A+ Brand NEW!!!!!!!

Preview 3 out of 16  pages

  • August 16, 2024
  • 16
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CSLB Concrete C8 License Practic
  • CSLB Concrete C8 License Practic
avatar-seller
Tutordiligent
CSLB Concrete C8 License Practice Test #1
Latest Update 2024-2025 100 Questions and
100% Verified Correct Answers Actual Exam
Guaranteed A+ Brand NEW!!!!!!!

A mix with a higher percentage of rock has the advantage of: - CORRECT ANSWER:
Being less expensive.


A standard truck load of concrete is around 10 cubic yards of material. In a pour with an
average depth of 8 inches, and a width and length of 12 by 32 feet, how much will the
second truck need to bring? - CORRECT ANSWER: One load was enough


Explanation:
Step 1. Solve for the volume of the pour: 12 x 32 x 8/12 (or 0.667) = 256.128 cubic
feetStep 2. Convert cubic feet into cubic yards.256.128 ÷ 27 = 9.49 cubic yardsSince
one truck carries 10 cubic yards of concrete, one truck will be enough for the pour.


Air-entraining: - CORRECT ANSWER: Improves the working life of concrete.


At what times, during set-up, is it important to pay special attention to keeping concrete
sufficiently moist? - CORRECT ANSWER: In hot and cold weather.


Explanation:
Cold weather reduces air humidity, hot weather increases evaporation.


Bundled reinforcing bars are normally required to have a minimum cover of at least the
diameter of the bundle, except in the case of permanent proximity to earth where the
minimum will be: - CORRECT ANSWER: 3 inches


Compacting placed concrete is advisable because of: - CORRECT ANSWER: Higher
cured strength.

,Construction joints are: - CORRECT ANSWER: Joints designed to separate one pour
from another.


Construction loads are: - CORRECT ANSWER: The maximum loads to which a
structure will ever be subjected.


Control joints in sidewalks should be spaced at what intervals? - CORRECT ANSWER:
Equal to the width of the slab


Explanation:
Generally the control joints in sidewalks should be spaced equal to the width of the slab,
but not more than 6 feet apart.


Finishing with a steel float: - CORRECT ANSWER: Reduces risk of cracking.


For quick dry applications you would most commonly use which kind of concrete? -
CORRECT ANSWER: Type 3


From an engineering perspective, concrete has the advantage of high compressive
strength. Maximum strength is reached after: - CORRECT ANSWER: 28 days


Green concrete is: - CORRECT ANSWER: Concrete that has been treated for water
exposure


High-early: - CORRECT ANSWER: Is cured after 7 days.


How long can a batch of concrete be in the truck before considerations of quality arise?
- CORRECT ANSWER: 45 minutes

, How many cubic yard of concrete is required for a 4" slab with the diameter of 15 feet? -
CORRECT ANSWER: 2 ½ cubic yards


Explanation:
Traditional MethodUse the following formula:Area of the circle = π x r x rWhere π = 3.14
and radius (r) = 7.5 feet (half of the diameter length)Area = 3.14 x 7.5 x 7.5Area =
176.625 sq. ft.Multiply area by the depth of the slab (in feet) to find the volume in cubic
feet.176.625 x .333 = 58.82 cubic feetConvert cubic feet into cubic yards.58.82 ÷ 27 =
2.18 cubic yardsSince 2.18 is not a given option, round up the number to 2.5 cubic
yardsShortcut MethodThis problem can be solved using a much simpler method. First is
to find the area of the square, then convert it into the area of the circle by multiplying it
by 78.5%.Area of the square = 15' x 15' = 225 square feetArea of the circle = 225 x .785
= 176.625 square feetDivide the volume by 81 to solve for the cubic yards for a 4"
slab.176.625 ÷ 81 = 2.18 cubic yardsSince 2.18 is not a given option, round up the
number to 2.5 cubic yards


How many cubic yard of concrete is required for the footing shown, if it is 75 feet long? -
CORRECT ANSWER: 2 ½ cubic yards


Explanation:
Step 1: Figure out the area of the face of the footing.Top area = 6" x 9" = 54 square
inchesBottom area = 6" x 12" = 72 square inchesTotal area = 54 + 72 = 126 square
inchesStep 2: Convert square inches into square feet.126 ÷ 144 = 0.875 square
feetStep 3: Get volume by multiplying the previous answer by the length.0.875 x 75 =
65.625 cubic feetStep 4: Convert cubic feet into cubic yards.65.625 ÷ 27 = 2.43 cubic
yardsSince there is no exact answer, round up the number.


How many cubic yards of backfill are required for a 3' x 5' trench, 1500 ft long, with a 1
foot diameter pipe? - CORRECT ANSWER: 789.72


Explanation:
Step 1. Find the net face area of the trench deducting for pipe.Face area including pipe:
3 x 5 = 15 square feetArea of the pipe: 𝐴=𝜋𝑟2A = 3.14 x .5 x .5A = 0.785Find the face
area of the trench minus area of the pipe, which will give you the net area for the
backfill.15 - 0.785 = 14.215Step 2. Find the total volume of the backfill.14.215 x 1500 =

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Tutordiligent. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $20.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79373 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$20.99
  • (0)
  Add to cart