what type of fire extinguisher is required on a crane - ANS10BC
what should am operator do in the event of a power line contact - ANSremain in the machine
unless fire or emergency
what is the minimum distance from a 200kv power line - ANS20ft
where must electrocution warnings be displayed - ANS1 in the cab, 2 on the outside
a boom angle indicator does not show what? - ANSboom deflection
hand signals must use what method? - ANSstandard method
An operator must obey a stop signal from who? - ANSanyone
when using radio, telephone or electronic signals, receiving must be what? - ANShands free
what must voice signals include? - ANSfunction and direction, distance and speed, function and
stop
what is the minimum number of wraps on a drum - ANS2
most LMI's will not indicate - ANSLevelness
if signals are interrupted the operator must do what? - ANSstop safety
all directions must be given in the operator's what? - ANSperspective
what are the ANSI/ASME audible signals - ANS1 stop
2 forward
3 reverse
when can an LMI be used to weigh a load? - ANSup to 75% of capacity at the working radius
what is the correct procedure if an LMI fails? - ANSuse the load chart and the boom angle
unless not allowed by the manufacturer
what functions are disabled by a kick-out system? - ANShoist up, boom down, telescope out
power lines are always presumed what? - ANSenergized
, travel distance on 2 way levers shall not exceed what? - ANS14 inches from neutral
forces shall not be greater than what on a foot pedal? - ANS50 pounds
a crane traveling at 15 mph must be able to stop in what distance? - ANS32 feet
what does PCSA stand for? - ANSpower crane and shovel association
what is the safety factor for synthetic slings? - ANS5 to 1
what is PS - ANSplow steel
an annual inspection must be performed by a - ANSqualified person
what is the construction rigging standard? - ANS1926.251
what is the general industry rigging standard - ANS1910.184
what is the general industry crane standard - ANS1910.180
what is the construction crane standard - ANS1926.1400 also known as subpart cc
what is the ANSI/ASME standard for construction crane - ANSB30.5
what does ANSI stand for - ANSAmerican national standards institute
what does ASME stand for? - ANSAmerican society of mechanical engineers
what does CFR stand for - ANScode of federal regulations
what part of the load charts does not show boom deflection - ANSrange diagram
A deduction should be made for an extension even when lifting from it?
true or false - ANSfalse
what do asterisks signify on a load chart - ANSstructural capacity
the maximum list allowed for a land crane on a barge is? - ANS5 degrees
land cranes on a barge fall under what ANSI standard - ANSB30.8
dynamic movement of a barge can make lifts be what? - ANSUnpredictable
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller AllLegitExams. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.49. You're not tied to anything after your purchase.