100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Skywest ERJ Ground SV Study Guide $12.49   Add to cart

Exam (elaborations)

Skywest ERJ Ground SV Study Guide

 14 views  0 purchase
  • Course
  • Skywest
  • Institution
  • Skywest

Skywest ERJ Ground SV Study Guide List all of the items for the Flight Deck Emergency Equipment - Checked line on the Safety and Power Up expanded checklist DOORWAY • PBE (1) - Check for seal integrity • Halon Fire Extinguisher (1) - Pressure in green, pin installed • Crash Axe (1) - Sto...

[Show more]

Preview 4 out of 34  pages

  • August 11, 2024
  • 34
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Skywest
  • Skywest
avatar-seller
Pogba119
Skywest ERJ Ground SV Study Guide
Questions with correct Answers

List all of the items for the Flight Deck Emergency Equipment - Checked line on the
Safety and Power Up expanded checklist - answer DOORWAY
• PBE (1) - Check for seal integrity
• Halon Fire Extinguisher (1) - Pressure in green, pin installed
• Crash Axe (1) - Stowed

CA SIDE
• Flashlight - LED flashing
• Life Vest (1) - Installed in seat back pocket
• Jumpseat Life Vest (1) - Installed in seat back pocket
• Circuit Breakers - Closed or collared
• Escape Rope - Check

FO SIDE
• Flashlight - LED flashing
• Circuit Breakers - Closed or collared
• Life Vest (1) - Installed in seat back pocket
• Escape Rope - Check
• Landing Gear and RAT Safety Pins - Onboard

OBSERVER SEAT
• Observer Seat - Check Secure
• Observer O2 - Check
• Observer Headset - Check Condition

Source: SOPM 04-01.5

After turning Batteries 1 and 2 to "ON" and "AUTO," what three things are we looking
for? - answer 1) Screens 2 and 3 illuminate with a status page and EICAS
2) IESS is aligning
3) Battery 1 and 2 voltage > 22.5V

Source: ERJ Initial Ground Slide 59-60

Under what voltage must a "battery recharge procedure" be accomplished? - answer
If Battery voltage is between 21.0 and 22.5 volts.

Source: SOPM 04-01.7

,Why is it important to wait approximately 30 seconds after energizing the batteries
before running the fire extinguisher panel test? - answer To verify there are no fire
protection fail messages displayed on the EICAS after power up

Source: SOPM 04-01.8

List all items that are part of the fire extinguisher panel test. - answer - Aural warning
- Fire handles illuminated
- CARGO SMOKE FWD / AFT buttons illuminated
- APU button illuminated
- Upper half of the APU Emergency Stop Button illuminated
- WARNING lights flashing
- "CARGO FWD (AFT) SMOKE" EICAS message
- "APU FIRE" EICAS message.
- "ENG 1 (2) FIRE" EICAS message
- "FIRE" warning annunciation displayed inside ITT indicators

Source: SOPM 04-01.8

How many halon bottle(s) serve engine fire suppression? - answer Two.

Source: AOM Vol. 2, 14-07-10, 1-2

Pulling the fire handle does what? - answer Commands the following valves to close:
Fuel shutoff valve
Hydraulic shutoff valve
Bleed air shutoff valve
Cross bleed shutoff valve

Source: AOM Volume 2, 14-07-10 2/4

Rotating the fire handle does what? - answer Discharges engine fire bottle A (left) or
B (right)

Source: ERJ Fire Protection CBT, Slide 10

How many halon bottle(s) serve APU fire suppression? - answer One.

Source: AOM Vol. 2 pg. 14-07-10 p2

What does pressing the APU EMER STOP button do? - answer Closes the APU fuel
shutoff valve, shutting down the APU with no cooldown period. A white striped bar
illuminates on the lower half of the button.

,Note: After the APU EMER STOP pushbutton is pressed, the APU FIRE
EXTINGUISHER pushbutton illuminates entirely red.

Source: AOM Vol. 2 pg. 14-04-05 1/2

What button do I press to discharge halon to the APU? - answer APU Fire
Extinguisher pushbutton.
Note: Will illuminate once APU EMER STOP button is pressed, OR 1m after fire is
detected.

Source:
Source: ERJ Fire Protection CBT, Slide 9

Will the APU automatically shut down for fire? If so, when? - answer Yes, on ground
after 10 seconds.

Source: ERJ Fire Protection CBT, Slide 11

How many fire detectors are in each cargo bin? Smoke detectors? - answer No fire
detectors. Smoke Detectors: 3 - FWD; 2 - AFT.

Source: ERJ Initial Ground Slide 72; AOM Vol 2 sec 14-07-20 pg 1

How many halon bottle(s) serve Cargo fire suppression? - answer 1 high rate; 1 low
rate.

Source: ERJ Initial Ground Slide 72

Will any cargo bottle automatically discharge at any time? - answer Low rate bottle
will automatically discharge one minute after discharging high rate bottle in flight.

Source: ERJ Initial Ground Slide 74

How do I discharge the low-rate bottle for a non-annunciated forward cargo fire on the
ground? - answer Push FWD Cargo Fire Extinguisher button three times.

Source: ERJ Initial Ground Slide 74

Briefly explain how a LAV SMOKE EICAS message would appear. - answer If smoke
is detected in either lavatory by one of the lav smoke detectors.

Source: ERJ Initial Ground Slide 77

Does LAV SMOKE mean the halon bottle has discharged? - answer No; temperature
inside waste container must exceed a certain limit and the bottle will automatically
discharge.

, Source: ERJ Initial Ground Slide 78

List a few important items on HOT BAT BUS 1 and 2. - answer Engine fire
extinguishing - HOT BATT BUS 1 & 2 (AOM Vol 2, 14-07-10 p1)
Refueling panel - HOT BATT BUS 2 ((AOM Vol 2, 14-07-5 p9)

What type(s) of circuit breakers do(es) the E170 have? How do I access them? -
answer Thermal - located in cockpit (""non-remote"" - checked by crew) and in
electronics bays (""remote"" - checked on MCDU)
Electronic - all located in electronics bays. Always checked on MCDU.

Source: ERJ Initial Ground Slide 88

What is the primary purpose of a TRU? - answer Convert AC to DC power.

Source: ERJ Initial Ground Slide 89

In an electrical emergency, the batteries will provide at least ___ minutes of electrical
power. - answer 10.

Source: ERJ Initial Ground Slide 89

Briefly explain the purpose of the RAT - answer Supplies AC power in emergencies.

Source: ERJ Initial Ground Slide 90

A DC GPU can replace battery ___ in the event it is inoperative for APU starts. - answer
2.

Source: ERJ Initial Ground Slide 91

Sources of AC power include... - answer IDG 1/2, APU GEN, GPU, RAT

Source: ERJ Initial Ground Slides 90-93

What is "Electrical Power Priority?" - answer 1- Respective IDG (Onside)
2- APU Gen (Inside)
3- AC GPU (Outside)
4- Opposite IDG (Cross-side)

Source: ERJ Initial Ground Slide 94

After starting the left engine with the APU on, what generator will power AC BUS 2? -
answer APU GEN

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Pogba119. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77858 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart