"Just as needed" team involvement to reduce owners pre-construction
expenses Right Ans - Integrated projects are distinguished by all of the
following characteristics EXCEPT:
a. Previous negative experience with adversarial project team relationships
b. Desire for reduction in project claims and disputes
c. Desire to utilize collaboratively-produced BIM as a facilities management
asset
d. Expectation of benefit from innovation stemming from collaborative effort
e. All of the above Right Ans - Experienced owners may require project
teams to utilize integrated project delivery based upon
Team culture based upon problem resolution rather than determination of
liability Right Ans - Which of the following is TRUE concerning application
of integrated project delivery?
CSI validates and certifies information contained in Green Format Right
Ans - The following are TRUE concerning CSIs GreenFormat online product
data resource EXCEPT
Market analysis of demand for sustainable products Right Ans - According
to the BEES model, life cycle analysis (LCA) is characterized by all of the
following EXCEPT
Provide a rational assessment of the environmental impact of building
products Right Ans - The goal of ASTM sustainability standards, the EPA
Energy Star program, and the NIST BEES program is to
Automated product characteristic/ specification content coordination
Right Ans - Which of the following is not included in the quoted description of
benefits that BIM brings to the design and construction process?
, The delivery of the facility to the owner Right Ans - The goal of the project
is defined by the PDPG as
a. Conceptualization
b. Criteria Design
c. Detailed Design
d. Implementation Document
e. All of the above Right Ans - The nationally-recognized "California AIA
Integrated Project Delivery Guide" redefines the stages of a project to include
which of the following?
A process integral to the design phase of a project Right Ans - In the CSI
CDT program, construction document production is defined as all of the
following EXCEPT
Source Quality Control Right Ans - All of the following could be Articles in
Part 1 of a specification EXCEPT
Feasibility Studies Right Ans - The Design phase of a project includes all of
the following EXCEPT
During project conception and schematic design Right Ans - When is the
CSI/CSC UniFormat most often used?
General Conditions Right Ans - The general contract clauses that establish
payment responsibilities are found in
a. 05 00 00 Metals
b. 05 20 00 Metal Joists
c. 05 21 00 Steel Joist Framing
d.05 21 19 Open Web Steel Joist Framing Right Ans - An example of
MasterFormat Level 3 specification section is
Owner and Contractor Right Ans - The contractual relationship governed
by the Conditions of the Contract is between
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Studyhall. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.99. You're not tied to anything after your purchase.