100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CSI CDT Exam – Questions With Verified Solutions $16.99   Add to cart

Exam (elaborations)

CSI CDT Exam – Questions With Verified Solutions

 7 views  0 purchase
  • Course
  • CDT*
  • Institution
  • CDT*

CSI CDT Exam – Questions With Verified Solutions

Preview 3 out of 18  pages

  • August 11, 2024
  • 18
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CDT*
  • CDT*
avatar-seller
Studyhall
CSI CDT Exam – Questions With Verified Solutions

Principle stakeholder - initiates project, assumes risk, provides funding
Right Ans - Owner

Protect public health, safety and welfare Right Ans - AHJ - Authorities
Having Jurisdiction

Address planning issues, determine design program, identify codes and
regulations, produce procurement and construction documents, administer
construction contract, *provide QA/QC procedures* Right Ans - Design
Team

Entity that constructs a facility. Uses management abilities to gather labor
forces, subs, and material/product/equipment suppliers Right Ans -
Contractor Team

Furnishes the materials and products for the facility to be constructed.
Fabricator, Distributor, Manufacturer, Supplier. Right Ans - Supplier Team

The life cycle of a facility, from concept through construction to use and
eventual deconstruction.
Project Conception
Project Delivery
Design
Construction Documents
Procurement (Bidding/Negotiating/Purchasing)
Construction
Facility Management Right Ans - Facility Life Cycle

Transforms the needs of owner into clear concept on which project can be
designed. Feasibility Study, Programming, Site Selection, Budgeting. Right
Ans - Project Conception

Determine delivery method to be used. Factors - qualifications, experience,
capacity, project extent, time requirements. Right Ans - Project Delivery

,Two Phases: schematic design and design development. Deliverables include
graphic and written design documents and estimates of project cost. Right
Ans - Design

Overall relationships and functions. Site plan and area, general
size/shape/massing of elements, elevations and exteriors established,
conceptual design criteria identified.
Deliverables - schematic drawings, probable cost, preliminary schedules
Right Ans - Schematic Design

Technical issues of constructibility and integration of systems and
components.
Deliverables - Tech information, outline specifications, updated schedule,
updated cost estimate. Right Ans - Design Development

Defined as the written and graphic documents prepared or assembled by the
A/E for communicating the project design for construction and administering
the construction contract. Construction documents include two major types of
documents: Procurement documents and Contract documents. Right Ans -
Construction Documents

Acceptance of the contractor's bid or negotiated sum and other conditions will
result in award of a contract and commencement of work. Right Ans -
Procurement (Bidding/Negotiating/Purchasing)

Responsibilities:
Contractor - perform work, project coordination, comply with project
documents.
A/E - construction admin, evaluation services, certify application for payment,
final inspection of work.
Owner - provide information, process payments, approve contract
modifications, accept project upon completion. Right Ans - Construction

During occupancy, owners & facility managers maintain and evaluate the
performance of the project and determine suitability for continuing use.
Right Ans - Facility Management

, A multi-table informational framework for organizing information used by the
architectural, engineering, and construction industry. Right Ans -
OmniClass

Uniform classification system for organizing preliminary construction
information into a standard order or sequence on the basis of systems or
assemblies. Particularly useful in conceptual design. Element Identification.
Right Ans - UniFormat

Arranges related construction practices, logical groupings of work results, into
a series of divisions. 50 division format. Used for Specifications, data
organization, and cost classification. Right Ans - MasterFormat

00 Procurement and Contracting Requirement Group

Specifications Group
- General Requirements 01
- Facility Construction Subgroup (concrete)
- Facility Services (plumbing/HVAC)
- Site and Infrastructure (Earthwork)
- Process Equipment (WW equipment) Right Ans - MasterFormat Groups

Provides a uniform approach to organizing specification information by three
primary parts. General, Products, Execution Right Ans - SectionFormat

Environmental performance of the facility over course of its life cycle. Takes
place at the product and facility level. Right Ans - Sustainable Design

National Institute of Technology (NIST) - Building for Env. and Economic
Sustainability (BEES) - for building products

EPA - Energy Star program - products are rated for sustainability criteria
compliance

US Green Building Council (USGBC) - Leadership in Energy and Environmental
Design (LEED) - certifies facilities on USGBC criteria Right Ans -
Environmental Design Tools

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Studyhall. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $16.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81989 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$16.99
  • (0)
  Add to cart