100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
OMGT 5783 SOCIOLOGY MANAGEMENT Exam Questions and Answers A+ Graded Verified A. $17.49   Add to cart

Exam (elaborations)

OMGT 5783 SOCIOLOGY MANAGEMENT Exam Questions and Answers A+ Graded Verified A.

 8 views  0 purchase
  • Course
  • OMGT 5783
  • Institution
  • OMGT 5783

OMGT 5783 SOCIOLOGY MANAGEMENT Exam Questions and Answers A+ Graded Verified A.

Preview 4 out of 91  pages

  • August 10, 2024
  • 91
  • 2024/2025
  • Exam (elaborations)
  • Unknown
  • OMGT 5783
  • OMGT 5783
avatar-seller
AcademicAllure
OMGT 5783 SOCIOLOGY
MANAGEMENT Exam Questions and
Answers A+ Graded Verified A.
If resources are not adequate to meet peak demands, the resulting
reschedule is termed


a. resource-constrained scheduling.
b. mandatory leveling.
c. allocation.
d. project resource adjustment.
e. time-constrained scheduling
Verified Answer -a. resource-constrained scheduling.


A(n) ________ constraint addresses the sequence in which project
activities must occur even after considering resource constraints.


a. technical or logic
b. hard
c. predecessor
d. successor
e. serial
Verified Answer -a. technical or logic


In a resource-constrained project the second priority in assigning resources
is usually given to activities with the

,a. highest cost.
b. smallest duration.
c. most slack.
d. least slack.
e. lowest identification number.
Verified Answer -b. smallest duration.


If three copiers are needed to produce a final report on time and only two
are available, the project is facing a(n) ________ type of resource
constraint.


a. people
b. physical
c. budget
d. material
e. equipment
Verified Answer -e. equipment


Consider the following table of activities A through E in which A is the
start node and E is the stop node. Assume all activities require the same
resource.
Verified Answer -


Which constraint category should be considered before all others?


a. Equipment resource constraints
b. Human resource constraints

,c. Time constraints
d. Material resource constraints
e. Logical and technical constraints
Verified Answer -e. Logical and technical constraints


When the work in an activity is interrupted to work on another activity and
is then resumed at a later point in time, it is called _________.


a. splitting
b. preempting
c. prioritizing
d. All of these alternatives are correct.
e. overriding
Verified Answer -a. splitting


When looking at the critical path for a delayed project and the project
manager sees that adding resources will reduce or remove the delay, the
project manager knows that the project is:


a. Unstable.
b. Over Allocated.
c. Institutionally Challenged.
d. Ahead of schedule.
e. Time-Constrained.
Verified Answer -e. Time-Constrained.

, A special truck that is needed on the project has been assigned to another
project. This is an example of what type of resource constraint?


a. Working capital
b. Equipment
c. People
d. Information
e. Materials
Verified Answer -b. Equipment


A project leader has realized that two activities in the project cannot be
done at the same time because not enough resources are available.
Activity 3 is critical and has a duration of 5 days. Activity 4 has 2 days of
slack and a duration of 2 days. How will the project leader decide which
activity should be scheduled first?


a. The activity with the highest cost
b. The activity with the least slack
c. The activity with the most slack
d. The activity with the smallest duration
e. The activity with the lowest identification number
Verified Answer -b. The activity with the least slack


In order that the new product is on the shelf for the Christmas buying
season, the development of the new product would be classified as a(n)
________ -constrained project.


a. technical

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller AcademicAllure. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79751 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$17.49
  • (0)
  Add to cart