100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
OSHE 382 Final Exam Questions & Detailed Answers $15.49   Add to cart

Exam (elaborations)

OSHE 382 Final Exam Questions & Detailed Answers

 0 view  0 purchase

OSHE 382 Final Exam Questions & Detailed Answers

Preview 2 out of 14  pages

  • August 10, 2024
  • 14
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (5)
avatar-seller
Schoolflix
OSHE 382 Final Exam Questions & Detailed
Answers

What is the size of the crane danger zone when working near power lines? - ANS A
radius of 10 feet



What are four methods used to safely control power lines? - ANS -Reenergize

-Relocate

-Bury

-Insulate



What a demolition engineering survey used for? (2) - ANS -To determine the
condition of the building's framing, floors and walls

-To evaluate the possibility of an unplanned collapse



Who must create a engineering survey prior to demolition? - ANS A competent
person



Who must fill out the construction blasting survey? - ANS A qualified person



Who should be directing the explosives work if a demolition? - ANS A structural
engineer or competent person

, What is a blasting permission for the use of explosives based on? - ANS A minimum
of 90 degrees of open space extended vertically for at least 150% of the structure's
height



What are the three phases of construction site preparation? - ANS Removal of
power lines, demolition, and blasting



What three things must be done before blasting occurs? - ANS -A written survey
must be completed by a qualified person

-Seismic and vibration tests must be performed

-A permission for the use of explosives must be obtained



Why are seismic and vibration tests performed before blasting? - ANS To
determine the proper safety limits



Open fires and flames should are prohibited within ___ feet of any explosive
material. - ANS 100 Feet



A ____ is a competent person who uses explosives. - ANS Blaster



The overall demolition plan should include: (List 4) - ANS -The Methods used to
bring down the structure

-The sequence of demolition work

-The equipment needed to perform the project

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Schoolflix. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82215 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.49
  • (0)
  Add to cart