100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CDC 3E251 VOLUME 4 EXAM WITH COMPLETE QUESTIONS AND VERIFIED ANSWERS $12.59   Add to cart

Exam (elaborations)

CDC 3E251 VOLUME 4 EXAM WITH COMPLETE QUESTIONS AND VERIFIED ANSWERS

 10 views  0 purchase
  • Course
  • CDC 3E251 VOLUME 4
  • Institution
  • CDC 3E251 VOLUME 4

CDC 3E251 VOLUME 4 EXAM WITH COMPLETE QUESTIONS AND VERIFIED ANSWERS...

Preview 2 out of 10  pages

  • August 7, 2024
  • 10
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • cdc
  • cdc 3e251
  • 3e251
  • cdc 3e251 volume 4
  • CDC 3E251 VOLUME 4
  • CDC 3E251 VOLUME 4
avatar-seller
Mirror
CDC 3E251 VOLUME 4 EXAM WITH COMPLETE
QUESTIONS AND VERIFIED ANSWERS


Which special capes team(s) concentrate on doing airfield repairs when opening the
airbase? - ANSWER Contingency Response Group (CRG) and Red Horse

After airfield repairs and opening the base for operations, which unit will take over
to continue airfield repairs? - ANSWER Prime BEEF

Which rapid runway repair (RRR) equipment set enables the completion of AT
LEAST 6 craters within 4 hours? - ANSWER R-2

Of the rapid runway repair (RRR) equipment sets, which one is a supplemental kit
capable of repairing 12 craters in 4 hours? - ANSWER R-3

Which pavement damage is caused by general-purpose bombs in the 100-pound
class and delay-fused munitions? - ANSWER Large crater

What are the typical dimensions for the minimum operating strip (MOS) for
tactical aircraft (fighters)? - ANSWER 50x5,000 ft.

What type of crater repair do we make to upgrade expedient repairs? - ANSWER
Sustainment

Airfield sustainment repairs are an upgrade to the expedient repairs and are
designed to support how many passes as compared to the expedient's 100 passes. -
ANSWER 5,000

After a conflict is over, what type of repairs are designed to turn the airbase to its
original condition? - ANSWER Permanent

When an enemy attack becomes imminent, the rapid runway repair (RRR) assets
MUST be - ANSWER Equally divided and dispersed to pre-designated areas

Which piece of heavy equipment should lead the way to clear debris from the
convoy route? - ANSWER Loader

How many expedient crater repair methods are used by the Air Force? - ANSWER
Seven

, Which equipment do we use in conjunction with a front-mounted broom to clear an
area where prefabricated surface mats are to be assembled? - ANSWER Grader

Which task must start the same time the loader is clearing the crater and the grader
is clearing the minimum operating strip (MOS) and taxiway locations? - ANSWER
Load and haul teams

Who determines how much fill material is needed at the crater repair sites? -
ANSWER Crater NCOIC

Where is the ideal place for the dozers to be downloaded? - ANSWER Side of the
crater closest to the minimum operating strip (MOS) edge

What is the FIRST action you take if it becomes necessary to repair a broken pipe
or cable located in a crater? - ANSWER Isolate the damaged utility

During upheaval removal the crater edge needs to be as vertical as possible and
how many inches deep - ANSWER 18 to 24

During the debris backfill method of crater repair, how many inches in diameter
will the debris be allowed to be pushed back into the crater? - ANSWER 12

What is the LAST step in the airfield damage repair (ADR) process before flying
operations can begin? - ANSWER Sweeping operations

During legacy spall repair, which method has a cure time of 20 minutes requiring
frequent cleaning of the mixer and hand tools? - ANSWER Fast-setting Portland
cement

Fast-setting Portland cement has an approximate cure time of twenty minutes, what
can this cure time be extended to during colder temperatures? - ANSWER 2 hours

Before you can use any material on Department of Defense (DOD) airfields, you
MUST make sure it - ANSWER Is certified for use

Using the new rapid airfield damage repair (RADAR) techniques, how many small
craters can be repaired within a 6 1/2 hour time span? - ANSWER 120

Which stage is considered the 3E2's primary tasking during advanced crater repair?
- ANSWER Damage Repair

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Mirror. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.59. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79373 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.59
  • (0)
  Add to cart