CDC 3E251 VOLUME 4 EXAM WITH COMPLETE
QUESTIONS AND VERIFIED ANSWERS
Which special capes team(s) concentrate on doing airfield repairs when opening the
airbase? - ANSWER Contingency Response Group (CRG) and Red Horse
After airfield repairs and opening the base for operations, which unit will take over
to continue airfield repairs? - ANSWER Prime BEEF
Which rapid runway repair (RRR) equipment set enables the completion of AT
LEAST 6 craters within 4 hours? - ANSWER R-2
Of the rapid runway repair (RRR) equipment sets, which one is a supplemental kit
capable of repairing 12 craters in 4 hours? - ANSWER R-3
Which pavement damage is caused by general-purpose bombs in the 100-pound
class and delay-fused munitions? - ANSWER Large crater
What are the typical dimensions for the minimum operating strip (MOS) for
tactical aircraft (fighters)? - ANSWER 50x5,000 ft.
What type of crater repair do we make to upgrade expedient repairs? - ANSWER
Sustainment
Airfield sustainment repairs are an upgrade to the expedient repairs and are
designed to support how many passes as compared to the expedient's 100 passes. -
ANSWER 5,000
After a conflict is over, what type of repairs are designed to turn the airbase to its
original condition? - ANSWER Permanent
When an enemy attack becomes imminent, the rapid runway repair (RRR) assets
MUST be - ANSWER Equally divided and dispersed to pre-designated areas
Which piece of heavy equipment should lead the way to clear debris from the
convoy route? - ANSWER Loader
How many expedient crater repair methods are used by the Air Force? - ANSWER
Seven
, Which equipment do we use in conjunction with a front-mounted broom to clear an
area where prefabricated surface mats are to be assembled? - ANSWER Grader
Which task must start the same time the loader is clearing the crater and the grader
is clearing the minimum operating strip (MOS) and taxiway locations? - ANSWER
Load and haul teams
Who determines how much fill material is needed at the crater repair sites? -
ANSWER Crater NCOIC
Where is the ideal place for the dozers to be downloaded? - ANSWER Side of the
crater closest to the minimum operating strip (MOS) edge
What is the FIRST action you take if it becomes necessary to repair a broken pipe
or cable located in a crater? - ANSWER Isolate the damaged utility
During upheaval removal the crater edge needs to be as vertical as possible and
how many inches deep - ANSWER 18 to 24
During the debris backfill method of crater repair, how many inches in diameter
will the debris be allowed to be pushed back into the crater? - ANSWER 12
What is the LAST step in the airfield damage repair (ADR) process before flying
operations can begin? - ANSWER Sweeping operations
During legacy spall repair, which method has a cure time of 20 minutes requiring
frequent cleaning of the mixer and hand tools? - ANSWER Fast-setting Portland
cement
Fast-setting Portland cement has an approximate cure time of twenty minutes, what
can this cure time be extended to during colder temperatures? - ANSWER 2 hours
Before you can use any material on Department of Defense (DOD) airfields, you
MUST make sure it - ANSWER Is certified for use
Using the new rapid airfield damage repair (RADAR) techniques, how many small
craters can be repaired within a 6 1/2 hour time span? - ANSWER 120
Which stage is considered the 3E2's primary tasking during advanced crater repair?
- ANSWER Damage Repair
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Mirror. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.59. You're not tied to anything after your purchase.