MICHIGAN BUILDERS LICENSE EXAM
Created to serve as a complete, comprehensive code regulating the construction of
single-family, two-family and buildings consisting of three or more townhouse units. -
answer- IRC (International Residential Code)
Administrative - answer- First 2 chapters of code book are
True - answer- Plans or supporting documents are almost always required by the
controlling authority prior to issuing a permit. T or F
Yes - answer- Does the building official have the authority to render interpretations of
the code?
8 foot fence. - answer- None of the following require a permit, EXCEPT:
sidewalks and driveways
tiling
an 8 foot fence
playground equipment
False - answer- Tables and illustrations are always supported by information found in
the written code and footnotes. T or F
Live load. - answer- The amount of evenly distributed weight imposed by inhabitants,
goods and removable objects on a floor or roof system is referred to as
True. - answer- If a code requirement is in the book, it is both acceptable and
enforceable by the code official. T or F
Figures. - answer- Illustrations are typically referred to as
Determine that buildings are built to the minimum enforceable standard. - answer-
Generally speaking, the building official's job is to
True. - answer- It is required that all manufacturer instructions be at the jobsite at the
time of inspection. T or FIC (Insulation Contact) - answer- Recessed lights must be
_____ rated.
True. - answer- Up to 15 square feet of glazing per dwelling unit is exempted from U-
value requirements. T or F
Registered design professional. - answer- The 2009 IECC requires a permanent
certificate posted on the electrical distribution panel. The certificate shall be completed
by the builder or
,State energy code requirements. - answer- One hurdle contractors face when bidding
for an energy efficient project is choosing materials that fit the design, and also meet
False. - answer- Historically significant buildings are not exempt from code changes. T
or F
R-value
Settled thickness
Manufacturer name - answer- Insulation products (blown and sprayed) must be
documented with:
March 2011. - answer- The new Michigan codes took effect in
10. - answer- Below grade walls are insulated from the top of the basement wall down
to _____ below grade, or the basement floor, whichever is less.
Area weighted average. - answer- The _______ is the combined Solar Heat Gain
Coefficient of all the glazed fenestration products in the building.
Thermal insulation R-values
Design criteria
Equipment systems - answer- Plans and specifications must be detailed in regards to:
2009. - answer- In Michigan, the residential energy code is based on the _____ IECC,
with certain amendments.
Air leakage. - answer- ___________ is the rate of air infiltration in the presence of a
specific pressure differential.
Windows
Attic access hatches
Recessed lights - answer- Air leakage is the random movement of air into and out of
________ through cracks and holes.
Table 402.1.1
2009 IECC - answer- R-values for insulation and fenestration requirements by
component can be found in
International Energy Conservation Code - answer- IECC
U-factor and UA alternatives. - answer- The _____________ compliance method allows
for more innovative construction techniques like SIPs or Advanced Framing.
500 sq feet - answer- R-30 is permitted in vaulted ceilings, but is limited to
,True. - answer- Floor insulation must be installed to maintain permanent and continuous
contact with the underside of the subfloor decking. T or F
5, 6 and 7. - answer- Michigan falls into climate zones
False. - answer- It is permissible for supply ducts to be run through the framing cavities
of a residential building. T or F
IC rated (Insulation Contact) - answer- __________ means an electrical fixture has
been tested and listed as suitable for installation in a cavity where the fixture may come
in contact with insulation.
3%. - answer- According to the Dept. of Energy, improved energy codes could reduce
CO2 emissions by
300 sq ft. - answer- Attic insulation markers must be installed every _____ square feet.
True. - answer- Buildings that are exempted from the new regulations are those with
very low energy use or ones that are neither heated or cooled. T or F
Yes. - answer- A contractor needs to remove a non-load bearing wall, does he need to
pull a permit?
No. - answer- A concrete contractor has been hired by an owner to install a driveway
and sidewalks. The lot is flat and the concrete is being place on undisturbed earth with a
prepared base. Does the contractor need to pull a permit?
Yes. - answer- A permit has been issued for a building project and there is a code
infraction in the building plans that has been overlooked by the building official. Can the
building official require a correction to a project that they previously overlooked?
Health department. - answer- Who issues a well and septic permit?
200 sq. feet.
IRC R105 - answer- Permits are not required for one story detached accessory
structures not exceeding:
Kitchen. - answer- All of the following are not considered habitable spaces EXCEPT:
bathrooms
kitchens
storage spaces
closets
3. - answer- Bathrooms must be provided with an aggregate glazing area no less than
_____ square feet, half of which must be openable.
, 44 inches. - answer- The maximum height of an egress window above the floor is
5.7 sq ft. - answer- A basement bedroom must have an egress window with a clear
opening of at least ______ square feet.
3. - answer- At least one side-hinged exit door must be in each dwelling unit, and must
be _____ feet wide.
30 inches. - answer- A porch more than _____ inches above grade must be provided
with 36" guards.
200. - answer- Wall and ceiling finishes shall have a flame-spread classification of no
more than ______ .
7 days. - answer- According to code, concrete must reach at least 70% of it's ability
within ____________days.
40%. - answer- A stud used for a non-bearing partitions may not be notched more than
____% of the stud width.
Additions, alterations, renovation and repairs. - answer- The Michigan Uniform Energy
code applies to new buildings as well as
U-factor. - answer- ___________ is a measure of how well the window or door
assembly conducts heat. The lower the number, the better insulation the assembly will
provide.
50%. - answer- Energy losses from recessed lighting fixtures can often reach ___% of
the total thermal loss of a ceiling.
R-3. - answer- Michigan requires a minimum thermal resistance of ____________for
mechanical system piping.
True. - answer- Oversized HVAC equipment has a higher initial cost, a higher operating
cost, provides less comfort, and shorter life expectancy. T or F
Prescriptive Path. - answer- _______ is the compliance route that applies Table 402.1.1
to building envelope components, and is considered the most simple.
Area weighted averages. - answer- ___________ can be used to satisfy U-factor and
SHGC requirements.
The next business day. - answer- If work requiring a permit is provided in an emergency
situation, the permit application must be submitted within:
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller GEEKA. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $14.49. You're not tied to anything after your purchase.