100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ProPrac Test 2 all Questions & answers solved 100% accurately with Complete Solution Graded A+ latest version $12.99   Add to cart

Exam (elaborations)

ProPrac Test 2 all Questions & answers solved 100% accurately with Complete Solution Graded A+ latest version

 2 views  0 purchase
  • Course
  • Institution

ProPrac Test 2 all Questions & answers solved 100% accurately with Complete Solution Graded A+ latest version

Preview 2 out of 10  pages

  • July 7, 2024
  • 10
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
ProPrac Test 2
In which project specification division would you expect to find windows: -
CORRECT ANSWER-08

In which project specification division would you expect to find structural steel: -
CORRECT ANSWER-05

The Architect's responsibility in review of a submittal provides for the following: -
CORRECT ANSWER-Limited checking for conformance with the contract
documents

Which is not a responsibility of the architect during the Construction phase: -
CORRECT ANSWER-Establish means and methods

In which phase does the design team work out clear, coordinated description of
the design including fully developed floor plans, sections, exterior elevations, wall
sections and key details but not final details or comprehensive interior elevations:
- CORRECT ANSWER-Design Development

Specifying end results that allow flexibility and creativity to meet requirements
instead of describing exact characteristics or specific named products is known
as: - CORRECT ANSWER-Performance Specifying

The specification 00 section that establishes a consistent understanding of the
procedures that bidders should follow in preparing their bids such as
consideration of bids is: - CORRECT ANSWER-Instruction to Bidders

The right for the owner to reject any or all bids is typically included in the bidding
documents: - CORRECT ANSWER-True

The contractor determines the date of Substantial Completion: - CORRECT
ANSWER-False

Who typically provides project record documents during project close‐out: -
CORRECT ANSWER-Contractor

, The variation of Design-build common in Europe and Japan where an owner
contracts with an architect for schematic design and technical review during
design and construction before handing the project over at design development
to a design-build entity is known as: - CORRECT ANSWER-Bridging

According to the textbook author Paul Segal, FAIA, on the majority projects, who
is the most effective Project Manager: - CORRECT ANSWER-Architect

According to a survey of construction project owners, approximately what
proportion of projects fail to meet either budget, schedule or both: - CORRECT
ANSWER-1/3

Which are TRUE statements of Integrated Project Delivery (IPD): - CORRECT
ANSWER-1) Professional Liability Insurance companies have problems
underwriting IPD project delivery methods
2) IPD cannot work without a committed owner who must have knowledge of the
industry

Which of the following are examples of Unqualified Language that potentially
alters the standard that the architect is held to: - CORRECT ANSWER-1) The
masonry walls have been completed
2) 100% complete Construction Documents

In which of these project delivery methods does the architect usually complete
their construction documents prior to the construction contractors being
determined: - CORRECT ANSWER-Design-Bid-Build

Which of the following is not a fundamental principal of Integrated Project
Delivery (IPD): - CORRECT ANSWER-Architect design control

According to the McGraw Hill, the top cause of disputes on infrastructure projects
is: - CORRECT ANSWER-Changes in the scope of work

Which item(s) impact the cost of professional liability insurance premiums: -
CORRECT ANSWER-1) Billing volume
2) Project type

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller TUTORSON. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81989 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart