100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ROADWAY WORKER PROTECTION MANUAL all Questions & answers solved accurately with Complete Solution Graded A+ latest version $11.49   Add to cart

Exam (elaborations)

ROADWAY WORKER PROTECTION MANUAL all Questions & answers solved accurately with Complete Solution Graded A+ latest version

 1 view  0 purchase
  • Course
  • Institution

ROADWAY WORKER PROTECTION MANUAL all Questions & answers solved accurately with Complete Solution Graded A+ latest version

Preview 2 out of 5  pages

  • July 6, 2024
  • 5
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
ROADWAY WORKER PROTECTION
MANUAL
Adjacent Tracks - CORRECT ANSWER-Two or more tracks with track centers
spaced less than 25 feet apart.

Adjacent Track - CORRECT ANSWER-A controlled or non controlled track
whose track center is spaced less than 25 feet from the track center of the
occupied track

Controlling Switch - CORRECT ANSWER-A switch that is either hand or power
operated, that controls entry to working limits

Effective Securing Device - CORRECT ANSWER-A vandal and tamper resistant
lock, keyed for application and removal only by the roadway worker(s) for whom
the protection is provided

employee - CORRECT ANSWER-An individual who is engaged or compensated
by a railroad or by a contractor to a railroad to perform any duties defined in this
part

Employee in Charge (EIC) - CORRECT ANSWER-An employee responsible for
a work group under the overarching authority of the Roadway Worker In Charge.

Employer - CORRECT ANSWER-A railroad or a contractor to a railroad that
directly engages or compensates individuals to perform any of the duties defined
in this manual.

Exclusive Track Occupancy - CORRECT ANSWER-A method of establishing
Working Limits on Controlled Track in which movement authority is withheld or
restricted by the Train Dispatcher or Block Operator, or one or more approaches
to the Working Limits are protected by Flagman.

Flag Man - CORRECT ANSWER-When used in relation to roadway worker
safety, means an employee designated by the railroad to direct or restrict the

, movement of the trains past a point on a track to provide on-track safety for
roadway workers.

Foul Time - CORRECT ANSWER-A method of establishing working limits on
controlled track in which a roadway worker is notified by the control operator that
no trains will operate within a specific segment of controlled track until the
roadway worker reports clear of the track as prescribed.

Fouling a Track - CORRECT ANSWER-The placement of an individual or an item
of equipment in proximity to a track that the individual or equipment could be
struck by a moving train or on-track equipment, or in any case is within four feet
of the field side of the near running rail. Locations specifically engineered to
provide protection from moving trains or on-track equipment may enroach into
the four foot envelope and still not be considered fouling. These locations are
designated as clearing bays.

Gang Watchman/ Advance Watchman - CORRECT ANSWER-An employee who
is qualified to provide warning to a roadway workers of approaching trains or
on-track equipment.

Inaccessible Track - CORRECT ANSWER-A method of establishing working
limits on non controlled track by physically preventing entry and movement of
trains and equipment

Individual Train Detection - CORRECT ANSWER-A procedure by which a lone
worker acquires on track safety by seeing approaching trains and leaving the
track before they arrive and which may be used only under circumstances strictly
defined in this manual.

Job Breifing - CORRECT ANSWER-A meeting conducted prior to going to work

Local Control - CORRECT ANSWER-When used in relation to Roadway Worker
Protection. C&S employees may request permission to take local control of an
interlocking to assist the Dispatcher when remote control is lost or to expedite
switch, signal or track circuit testing.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller examthreads. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart