100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NASCLA BOOKS COMBINED $10.49   Add to cart

Exam (elaborations)

NASCLA BOOKS COMBINED

 5 views  0 purchase
  • Course
  • Institution

NASCLA BOOKS COMBINED

Preview 4 out of 50  pages

  • July 4, 2024
  • 50
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
NASCLA BOOKS COMBINED

When do you need a permit for a retaining wall - ANS-When it is over 4 feet tall

The building official may revoke a permit if - ANS-it is issued in error or in violation of an
ordinance

Who can issue a notice of violation - ANS-Building Department

Shear Wall resists - ANS-Lateral pressure

What type of construction uses heavy timbers AND HIGHLIGHT CONSTRUCTION
TYPES - ANS-type IV construction uses heavy timbers - the exterior is made of
non-combustible materials and the interior of solid or laminated wood.

Headroom required in a multistory parking garage - ANS-7 foot

IF you are operating a forklift in a warehouse building with steel columns. What is the
minimum height to fireproof the columns to protect them from impact? - ANS-5 feet

What must be the temperature when using Sprayed Fire resistant material (SRFM). -
ANS-The temperature must be at least 40 degrees for 24 hours

How high must parapet walls be - ANS-Parapet walls must be at least 30" above where
the roof intersects the wall

What is the thickness of smoke barriers in steel group I-3 buildings - ANS-minimum 0.10
inch thickness

Shafts in building with more than ________ must have how many hours of fire rating. -
ANS-4 stories : 2 hours

137 - Table 716.6 - Fire window assembly fire protection ratings - ANS-Table 716.6 -
Fire window assembly fire protection ratings

What is the fire rating on an 2 layers of 5/8" of gypsum board (drywall) - ANS-2 hours

143- table 716.6 - ANS-143- table 716.6

,What material do you use to fire protect steel columns - ANS-gypsum wallboard.

What is finished wood flooring permitted to be attached to - ANS-embedded or fire
blocked wood sleepers

Can you occupy a structure or portion of a structure that has not been fire protection
systems - ANS-No, it is unlawful

Where should alarm signals be automatically be transmitted to - ANS-approved
supervising station

Where smoke alarms required, where should they get their power source from -
ANS-primary power from the building wiring, should not have on off switch and have a
battery backup.

What is the maximum and minimum height for fire alarm boxes - ANS-top of box at 42"
minimum and 48" maximum height from the floor.

What are the methods to supervise open backflow prevention valves - ANS-1. Central
station/remote station signaling.
2. Local signaling that will cause the sounding of an audible signal at a attendants
location.
3. Locking valves open
4.sealing of valves and approved weekly recorded inspection.

What is the minimum egress height of a ceiling - ANS-7 feet 6 inches.

Maximum Floor area allowance per occupant - ANS-100SF per occupant

When Doors are fully opened shall not reduce the width by more than - ANS-7 inches

What is the length of time that an Emergency Power system illuminate for - ANS-90
minutes.

When must a building have an elevator - ANS-When its more than 3 stories high

What is the size of a refuge area for a wheel chair - ANS-30" x 48".

All separation areas of refuge have to be separated by - ANS-a smoke barrier.

,What is the minimum width of a door opening - ANS-32"

The minimum height of interior door is - ANS-80"

Which way must the doors swing open when serving a room or area containing more
than 50 occupants - ANS-the doors must swing open in the direction of egress

How much pressure for nonfire interior door to open - ANS-5 lbs

What type of hardware is required on doors with occupant loads of more than 50. -
ANS-PANIC hardware

Minimum headroom height for stairway - ANS-6"8'

Maximum Riser height for stairway - ANS-7"

What is the maximum height from the floor for Emergency Escape and rescue opening
sills - ANS-44" above the floor

Required number of Accessible parking spaces required for a 60 space lot - ANS-3
accessible spaces

Van Parking Spaces - ANS-Must all be on one level

What percentage of the total air flow must be from the eaves - ANS-50- 60%

What is the spacing of fastenings(studs) for exterior metal siding - ANS-should be
spaced 24" vertically or horizontally

Asphalt shingles Roof Slopes 2:12 - ANS-need two plys of 15 pound felt

Asphalt shingles Roof Slopes 4:12 - ANS-need one ply of 15 pound felt

Asphalt shingles Roof - ANS-Type A and most fire resistant

319 - TABLE 1507.2.9.2 Valley Lining Material Thickness - ANS-319 - TABLE
1507.2.9.2 Valley Lining Material Thickness

, 326 - TABLES 1507.8.7 and 9.8 Wood Shingle and Shake Exposure Tables two tables
one for shakes and one for shingles - ANS-326 - TABLES 1507.8.7 and 9.8 Wood
Shingle and Shake Exposure Tables

What is the minimum slope for metal shingles - ANS-3:12

What is the minimum slope for built up roofs - ANS-¼: 12 (2%) slope for drainage.

When is a geotechnical inspection required for backfilling a footing. - ANS-backfilling
more than 12"under a footing.

The grade away from a building must be - ANS-at least 5% for at least 10 feet.

The top of the foundation drain materials must be - ANS-6" above the footing or filter
fabric over stone

398 - TABLE 1806.2 - Presumptive Load Bearing Values - ANS-398 - TABLE 1806.2 -
Presumptive Load Bearing Values

How big must holes for embedded post be - ANS-4" larger in diameter than the actual
column

What is the minimum depth of footings below undisturbed ground surface - ANS-12"

422 - TABLE 1904.2 Minimum Specified Compressive strength - ANS-422 - TABLE
1904.2 Minimum Specified Compressive strength

Minimum specified compressive strength for concrete - ANS-2500 psi

What are the minimum slab provisions - ANS-The thickness of concrete floor slabs
suppoted directly on the ground shall not be less than 3 ½ inhes.

A 6 mil polyethylene vapor retarder with joints lapped not less than 6" shall be placed
between the sub grade and the slab.

426 Slab Requirements TABLE - ANS-

Changing the edge distance from 4 1/2" to 7 1/2" will - ANS-increase the shear service
load on a 3/4 embedded bolt in 3000 PSI concrete to 740 lbs

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller EXAMQA. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81298 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart