It is important that the ____________ __________ read and understand project specifications. - finisher foreman If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be about _____ yd3 per hour. - 100 Concrete is sold by the ton? - False Delays in d...

[Show more]

Preview 2 out of 9  pages

  • June 27, 2024
  • 9
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
ACI Flatwork Questions & Answers |
100% Correct Answers | Verified | Latest
2024 Version
It is important that the ____________ __________ read and understand project specifications. -
✔✔finisher foreman



If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be
about _____ yd3 per hour. - ✔✔100



Concrete is sold by the ton? - ✔✔False



Delays in discharging concrete trucks can result in the concrete being hard to: - ✔✔pump, place, and
finish



When there is room for two concrete trucks ready to discharge into a pump hopper, placement is faster
because: - ✔✔as one truck is finishing, the other is ready to unload the concrete



Concrete from a ready mix truck must usually be completely discharged within _____ hours after water
has been added at the plant. - ✔✔1.5



You can tell when water has been added to the concrete truck by looking at the: - ✔✔batch ticket



When concrete for a slab placement will be discharged from the truck chute, truck arrivals should usually
be spaced at about: - ✔✔15 minutes



When finishers get behind because the concrete is setting faster than expected and the placing crew is
also shorthanded, one solution is slowing the concrete delivery rate to match worker output. - ✔✔True

, In deciding how much concrete to order for a floor placement, you should calculate the number of cubic
yards needed to fill the forms, then order two to three cubic yards less so you don't waste concrete that
is not needed. - ✔✔False



The question, "What finisher or finishers can request addition of water to the concrete truck on site?"
should be answered at the ______ _________. - ✔✔Pre-construction meeting



Concrete made with portland cement will set and harden while under water. - ✔✔True



If a concrete slab on ground won't be exposed to sulfates, the cement used is most likely to be: -
✔✔Type I



Most concrete used in slabs on ground has coarse aggregate with a maximum size of: - ✔✔3/4 to 1 1/2
in.



Sand for concrete used in slabs on ground is easier to finish when it has close to the largest allowable
amount of material passing the No. 50 and No. 100 sieve. - ✔✔True



Increasing the amount of sand in a concrete usually decreases the amount of water needed to make the
concrete workable. - ✔✔False



All concrete that will be subject to freezing when moist or be exposed the deicing salts should contain: -
✔✔an air-entraining agent



Strength of normal weight concrete depends mainly on: - ✔✔water-cement ratio



Overhanded concrete mixtures are likely to produce floors with poor wear resistance and excessive
shrinkage. - ✔✔True



To minimize shrinkage and reduce cracking and curling: - ✔✔use as much coarse aggregate as possible,
use as little mixing water as possible, and use aggregates with low shrinkage

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller hussle. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart