CDT Exam Questions & Answers | 100% Correct Answers | Verified | Latest 2024 Version 1. The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: a) Agreement. b) Conditions of the Contract. c) Div...

[Show more]

Preview 3 out of 23  pages

  • June 17, 2024
  • 23
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
CDT Exam Questions & Answers | 100% Correct
Answers | Verified | Latest 2024 Version
1. The method of computation of Contractor's overhead and profits for Change Order prices, where both
additions and deletions are involved, is found in the:

a) Agreement.

b) Conditions of the Contract.

c) Division 01.

d) Instructions to Bidders. - ✔✔b) Conditions of the Contract.



2. General Requirements are part of:

a) Supplementary Conditions.

b) Bidding Requirements.

c) Specifications.

d) Summary of Work. - ✔✔c) Specifications.



3. The three essential considerations in the evaluation of a product are:

a) Requirements, Criteria, and Tests.

b) Costs, Maintenance, and Installation.

c) Life Cycle Cost, Installation Cost, and Maintenance Cost.

d) Case studies, Failures, and Problems. - ✔✔a) Requirements, Criteria, and Tests.



4. Whose responsibility is it to furnish the Shop Drawings?

a) The Architect/Engineer

b) The Contractor

c) The Owner

d) The Subcontractor - ✔✔b) The Contractor



5. The division of the Work among multiple prime Contracts is described in:

,a) Instructions to Bidders.

b) Supplementary Conditions.

c) Division 01.

d) Special Conditions. - ✔✔c) Division 01.



6. During the Project Conception Stage, the A/E may be retained to:

a) Develop outline specifications

b) Describe the character of the mechanical system

c) Prepare renderings

d) Assist in financial feasibility studies - ✔✔d) Assist in financial feasibility studies



7. What is the main purpose of MasterFormat?

a) for scheduling, value management, recording of design data and managing costs.

b) used during the planning stage of a project.

c) to organize the Project Manual, reference keynotes and detailed cost estimates.

d) when there is a standardized need for information to appear upon each page of a project manual. -
✔✔c) to organize the Project Manual, reference keynotes and detailed cost estimates.



8. The person who becomes secondarily liable for another's debt or performance is called the:

a) Guarantee

b) Warrantor

c) Guarantor

d) Warrantee - ✔✔c) Guarantor



9. Integrated projects are distinguished by all of the following characteristics except:

a) Development of virtual project model through input from a collaborative team

b) Trust-based collaboration between project team members

c) Maximized efficiency through design, fabrication, and construction

, d) "Just as needed" team involvement to reduce owner's pre-construction expenses - ✔✔d) "Just as
needed" team involvement to reduce owner's pre-construction expenses



10. Outline Specifications are written for

a) only Divisions 02-14 where actual products are discussed

b) Divisions 01-49

c) only Divisions 01-14 (excluding mechanical and electrical)

d) the exclusive use of the A/E - ✔✔b) Divisions 01-49



11. An example of a MasterFormat Level 3 specification Section is:

a) 05 00 00 Metals.

b) 05 20 00 Metal Joists.

c) 05 21 00 Steel Joist Framing.

d) 05 21 19 Open Web Steel Joist Framing. - ✔✔d) 05 21 19 Open Web Steel Joist Framing.



12. What activities take place in the Project Conception Stage?

a) The engineers develop the mechanical and electrical systems.

b) The site is selected and the demolition is done.

c) Feasibility studies and budget is set.

d) The program is evaluated and the engineers are selected. - ✔✔c) Feasibility studies and budget is set.



13. The document recommended to organize preliminary construction information into a standard order
on the basis of systems and assemblies is:

a) MasterFormat

b) Uniformat

c) Outline Specifications

d) Project Manual - ✔✔b) Uniformat



14. All design and construction drawings can be classified as one of two types of views:

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller hov. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $8.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82191 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$8.99
  • (0)
  Add to cart