100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PJM Sample Test Review 2024 Questions and Answers $12.49   Add to cart

Exam (elaborations)

PJM Sample Test Review 2024 Questions and Answers

 5 views  0 purchase
  • Course
  • PJM Generation
  • Institution
  • PJM Generation

PJM Sample Test Review 2024 Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - Correct Answer ️️ -off cost out of merit. Monitoring ___________ may give insights into system constraints. - Correct Answer ️...

[Show more]

Preview 3 out of 17  pages

  • June 5, 2024
  • 17
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • PJM Generation
  • PJM Generation
avatar-seller
BrittieDonald
PJM Sample Test Review 2024 Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - Correct Answer ✔️✔️-off cost out of merit. Monitoring ___________ may give insights into system constraints. - Correct Answer ✔️✔️-Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - Correct Answer ✔️✔️-PJM calls on synchronized reserves If not cancelled by PJM, the minimum generation alert expires at the end of the specified ______________. - Correct Answer ✔️✔️-light load period When PJM declares a hot weather alert, the generation dispatcher should determine if maintenance can be deferred and notify all generating stations and key personnel. - Correct Answer ✔️✔️- During system restoration, the two categories of reserves are dynamic and spinning. - Correct Answer ✔️✔️- During system restoration, frequency should be maintained between 59.75 and 61.00 Hertz. - Correct Answer ✔️✔️- PJM issues a heavy load voltage schedule. Member companies who own generation facilities should ensure voltage regulators on generating units are in service & automatic. - Correct Answer ✔️✔️- A unit being dispatched economically by PJM should set its megawatt output based on the unit's dispatch rate or desired megawatt level. - Correct Answer ✔️✔️- A fossil steam unit is considered fuel limited whe n it is not capable of running at its maximum capacity for the next 72 hours - Correct Answer ✔️✔️- During system restoration prior to synchronization of a unit, the dispatcher should ensure sufficient load is available to stabilize unit operation. - Corre ct Answer ✔️✔️- A large unit in an external control area near PJM/PJM West trips. The PJM operator will see ace remain the same, frequency decrease. - Correct Answer ✔️✔️- LMPs will change when marginal generator output changes - Correct Answer ✔️✔️- The t wo control signals sent by the PJM E M S are regulation and dispatch rate (desired MW output). - Correct Answer ✔️✔️- An all -call is the one -way communication system used to disseminate information to market operation centers. - Correct Answer ✔️✔️- Real t ime bus prices may be monitored using data viewer. - Correct Answer ✔️✔️- Not offering an available PJM capacity resource into the day ahead market is a violation of PJMs two settlement market rules. - Correct Answer ✔️✔️- A unit that fails to start when scheduled, would be classified as an unplanned outage. - Correct Answer ✔️✔️- Maximum Generation Emergency is declared by PJM when generation is required above the highest incremental economic cost. - Correct Answer ✔️✔️- Maintenance outages are permitted when a unit can be held online until the following Monday, and system reliability is not affected - Correct Answer ✔️✔️- If PJM ace shows over -generation, actual imports are less than scheduled. - Correct Answer ✔️✔️- PJM wi ll request a Supplementary Status Report when a Maximum Generation Emergency Alert is issued. - Correct Answer ✔️✔️- If a fossil steam unit has less than 32 hours of fuel at maximum capacity, it should be bid at maximum emergency. - Correct Answer ✔️✔️- The loss of a large generation unit on the PJM system can be detected by monitoring frequency and PJM ace. - Correct Answer ✔️✔️- A 1000 megawatt unit has tripped in the PJM control area and the PJM ace now indicates under -generation of 1050 Megawatt. PJM sh ould request 100% synchronized reserves be loaded. - Correct Answer ✔️✔️- Alerts are issued in advance of a scheduled load period to allow sufficient time for the generation dispatcher to prepare for the anticipated capacity shortages - Correct Answer ✔️✔️- The amount of synchronized reserves must be large enough to cover the loss of the largest single energy contingency. - Correct Answer ✔️✔️-

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller BrittieDonald. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77016 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart