Mechanics Exam Review – NEIEP | 100% Correct Answers | Verified | Latest 2024 Version A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" sheave. What is required? - 100 fpm/125 fpm= 12"/ X =15 A MOV (Metal Oxide Varistor) burns out. You replace it, but...