IICL Container Inspector's Exam Questions and Answers Already Passed
6 views 0 purchase
Course
IICL Container Inspector\'
Institution
IICL Container Inspector\'
IICL Container Inspector's Exam
Questions and Answers Already Passed
Which of the following defects requires repair?
A. A loose door gasket
B. A bent J-bar that does not affect door operation
C. A dent 13mm (1/2 in) deep on the door sill
D. Four dents, each 11mm (7/16 in) deep, on contiguou...
IICL Container Inspector's Exam Questions and Answers Already Passed Which of the following defects requires repair? A. A loose door gasket B. A bent J -bar that does not a ffect door operation C. A dent 13mm (1/2 in) deep on the door sill D. Four dents, each 11mm (7/16 in) deep, on contiguous outboard corrugations of a roof panel ✔✔A. A loose door gasket Of the following conditions in a dry -van container, which one woul d require cleaning? A. Raised mud foot prints in excess of what might normally remain after a sweep out B. Dry dust covering dried floor stains as might normally be found after a sweep out C. Coffee beans remaining inside the container as might occur after a sweep out D. Polyurethane beads as might be expected to lodge in grooves between floorboards after a sweep out ✔✔C. Coffee beans remaining inside the container as might occur after a sweep out An Equipment Interchange Receipt (EIR), based on an inspection with no damage found, can be evidence of a container's compliance with: A. Australian Timber Component Treatment Regulations B. Convention for Safe Containers (CSC) regulations throu gh the ACEP Program C. Transport under custom's seal (TIR) regulations D. International Standards Organization (ISO) CEDEX codes regulations ✔✔B. Convention for Safe Containers (CSC) regulations through the ACEP Program The top of a replacement plastic v entilator should be centered what distance from the top side rail? A. 50 -55mm (2 -2 3/16 in) B. 70 -75mm (2 5/8 - 3 in) C. 100mm (4in) D. 150mm (6 in) ✔✔A. 50 -55mm (2 -2 3/16 in) When must a reference line extend the full length of a bottom side rail? A. Wh en there are two or more areas of damage on the bottom side rail B. When there is a sharp bend in the bottom side rail C. When there is a bowing over the entire bottom side rail D. When there is additional damage to the bottom side rail so that the refere nce line cannot be positioned over the ends of the damage ✔✔C. When there is a bowing over the entire bottom side rail Which of the following is NOT a transverse structural member of the container? A. Front sill B. Tunnel rail C. Rear header D. Crossme mber ✔✔B. Tunnel rail A steel corner fitting is being replaced. To ensure better weld penetration, IICL recommends that the edges of parts adjacent to the corner fitting be ground to a minimum bevel of? A. 30 degrees B. 45 degrees C. 55 degrees D. 60 deg rees ✔✔B. 45 degrees Which of the following components is sometimes placed longitudinally in the container to support plywood flooring? A. Transverse bow B. Gusset C. Hat section center spacer D. Threshold plate ✔✔C. Hat section center spacer Assuming owner and environmental regulations permit, which of the following procedures is NOT recommended for repairing tarpaulins or open top containers? A. Cleaning the area to be covered with acetone or mineral spirit B. Using a heat gun to fuse a patch to the t arpaulin C. Sewing on a patch of the same material as the tarpaulin D. Repairing a 6 mm (1/4 in ) pin hole with an epoxy compound ✔✔C. Sewing on a patch of the same material as the tarpaulin Which of the following is an example of a plank floor condition requiring repair AND which should be considered as damage? A. A crack or split with no evidence of impact, which leaks light B. A crack or split with a sign of impact which does not leak light C. A crack or split, adjacent to a dented bottom rail, which leaks light D. A crack or split, with no evidence of impact, with a loose piece ✔✔C. A crack or split, adjacent to a dented bottom rail, which leaks light Welds to corner fittings should be made with? A. CO2 semi -automatic welding B. Low hydrogen welding rods C. Fully automatic welding D. Arc welding ✔✔B. Low hydrogen welding rods All of the following procedures are required EXCEPT A. Weld smoke, spatter, etc. must be removed to permit adhesion of paint B. The damaged component(s) must be restored as close as possible to original size and profile C. Welds must be examined using radiographic or magnetic particle non -destructive testing equipment D. Replacement steel components must be painted with coating compatible with that originally applied to the container ✔✔C. Welds must be examined using radiographic or magnetic particle non-destructive testing equipment
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller StellarScores. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $11.49. You're not tied to anything after your purchase.