100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NYC HIGH PRESSURE STEAM EXAM STUDY GUIDE 2024 243 QUESTIONS WITH CORRECT ANSWERS ALREADY PASSED AND VERIFIED $15.49   Add to cart

Exam (elaborations)

NYC HIGH PRESSURE STEAM EXAM STUDY GUIDE 2024 243 QUESTIONS WITH CORRECT ANSWERS ALREADY PASSED AND VERIFIED

 16 views  0 purchase
  • Course
  • NYC HIGH PRESSURE STEAM
  • Institution
  • NYC HIGH PRESSURE STEAM

1 The maximum blow down for a safety valve on a forced flow steam generator or high temperature water boiler shall be of what percent of the set pressure? - CORRECT ANSWER 10%. HP Code: 14-9.12 3 Who oversees the code for any plumbing installations? - CORRECT ANSWER The NYC Plumbing Code NYC...

[Show more]

Preview 4 out of 34  pages

  • April 29, 2024
  • 34
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • NYC HIGH PRESSURE STEAM
  • NYC HIGH PRESSURE STEAM
avatar-seller
Courseinstructor
NYC HIGH PRESSURE STEAM EXAM STUDY GUIDE 2024 243 QUESTIONS WITH CORRECT ANSWERS ALREADY PASSED AND VERIFIED 1 The maximum blow down for a safety valve on a forced flow steam generator or high temperature water boiler shall be of what percent of the set pressure? - CORRECT ANSWER 10%. HP Code: 14 -9.12 3 Who oversees the code for any plumbing installations? - CORRECT ANSWER The NYC Plumbing Code NYC Mech: 1002.1 4 When will anchorage or guides be inspected? - CORRECT ANSWER Annually. NYC Mech: 1210.3.1.2 5 How many brass washout plugs does a miniature boiler have? - CORRECT ANSWER Not less than 3 Brass Washout Plugs 1 inches in size. HP Code 14 -11.5 6 How often are high pressure piping expansion joints inspected? - CORRECT ANSWER Weekly RCNY: 20 -02 a.2.i (HP steam piping). NYC Mech: 1210.3.1 (hydronics - monthly) 7 How long should a Hydronic System be pressure tested for? - CORRECT ANSWER 2 hours at no less than 100 PSIG. NYC Mech: 1208.1 8 How is a gauge protected from excessive pressure? - CORRECT ANSWER Shut off Cock RCNY: 20 -03 c,7 9 Who is authorized in witnessing a test on a gas piping system? - CORRECT ANSWER Plumbing Inspector, Architect, Licensed PE, Master Plumber, or Agency by the D.O.B RCNY 20 -01 a,1,2 NYC HIGH PRESSURE STEAM EXAM STUDY GUIDE 2024 243 QUESTIONS WITH CORRECT ANSWERS ALREADY PASSED AND VERIFIED 10 How should a remote disconnect be labeled? - CORRECT ANSWER Remote control for burner. NYC Mech: 1006.8.1 11 When is a fusible plug not needed to be installed on a boiler? - CORRECT ANSWER Over 200 PSIG. HP Code: 14 -10.17, b 12 When shall a power boiler with a MAWP over 400 be tested? - CORRECT ANSWER Pressure tested annually ( safety valve). HP Code: 14 -9.7, a,2 13 What shall a Design plan of a boiler and application contain but not limited to? - CORRECT ANSWER Size + Location, Operating Pressure + Temperature of the Pressure vessel, and Type + Specification of Pressure Relief. 14 Who is responsible for maintaining the copies of the certified welder qualifications report? - CORRECT ANSWER Copies of the certified welder qualification report she'll be maintained by the responsible WELDING AGENCY and the company performing th e welding, and shall be made available upon request to the DOB. RCNY: 20-02, b,2v,/22 -01,d,5. HP Code: 14 -3.7 15 Who needs to furnish a control diagram and boiler operation instructions? - CORRECT ANSWER The Installer. NYC Mech: 1004.7 16 Who will certify and calibrate all gauges utilized for testing? - CORRECT ANSWER All gauges utilized for testing shall be calibrated and certified annually in accordance with ASME B40.100 by the test operathor. NYC Mech: 1011.2 NYC HIGH PRESSURE STEAM EXAM STUDY GUIDE 2024 243 QUESTIONS WITH CORRECT ANSWERS ALREADY PASSED AND VERIFIED 17 What shall be placed in between different joints and piping material? - CORRECT ANSWER An approved Adapter Fitting NYC Mech: 1203.1.2 18 What items are exempt from the reporting requirements? - CORRECT ANSWER Exemptions: (1) the installation of backing rings in handhole or manhole openings or the building up of same; and (2) the seal welding of tubes to the tube sheet. HP Code: 14 -3.4, b, 1-2 19. Who will be under control for any welding done to a High -pressure tank? - CORRECT ANSWER The welding shall be under controlled inspection of an ENGINEER, supervising a welding inspection agency acceptable to the DOB RCNY: 22 -
01 d,2 20 At what pressure is it required to have extra heavy valves installed? - CORRECT ANSWER HP Code: 14 -10.21b / 14 -9.2,b 21 The -------------- files an application for a boiler alteration - CORRECT ANSWER Inspector HP Code: 14 -3.3 c, 2, ii 22 How many safety valves does a boiler have with over 500 square feet of heating surface? - CORRECT ANSWER At least 2 HP Code: 14 -9.4a 23 Gas fired Boilers not exceeding 100 square feet of heating surface shall de provided with a ? - CORRECT ANSWER Single or Double Cone type of Hood Diverter in the stack HP Code: 14 -6.2 NYC HIGH PRESSURE STEAM EXAM STUDY GUIDE 2024 243 QUESTIONS WITH CORRECT ANSWERS ALREADY PASSED AND VERIFIED 24 A heater for either liquid fuels or other liquids harmful to the boiler shall not be installed? - CORRECT ANSWER Directly in the steam or water space within a boiler. HP Code: 14 -5.1 25 Who is responsible for any spatial relationship between tanks and gas services? - CORRECT ANSWER The Installer of the last installation to correct the violation. RCNY: 22 -01, c,3 Who is responsible for the setting of operating and safety controls? - CORRECT ANSWER The Installing Company NYC Mech: 1004.7 27 With what safety fitting shall you protect High Pressure Steam and Water boilers with? - CORRECT ANSWER DUAL Low Water Cut Outs. NYC Mech: 1007.1. HP Code: 14 - 1. 14, a 28 Spring loaded safety valves have a total combined relieve capacity of? - CORRECT ANSWER 100% of the Max Designed Capacity of the Boiler. HP Code: 14 -9.5, b 29 What is the total combined relieving capacity of power actuated relieving valves? - CORRECT ANSWER NO LESS THAN 10% of the MAWP or NO HIGHER THAN 20% ABOVE the MAWP. HP Code: 14 -9.5, a, b 30 What is the minimum blowdown for a spring -loaded safety valve? - CORRECT ANSWER 2%. HP Code: 14 -9.12

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Courseinstructor. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67866 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.49
  • (0)
  Add to cart